§ 14-11-163 — INFORMATION REQUIRED
Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 14-11-163
Corpus is an independent public-information project, not the official City of Austin website. Stable reference URL
§ 14-11-163 - INFORMATION REQUIRED.
(A) An owner shall: (1) provide to the director information concerning facilities located in the right-of-way, including: (a) as-built drawings of all facilities installed in the right-of-way by the owner no later than the 35th day after the activity described in the permit is complete, unless otherwise prescribed by the director; and (b) the horizontal and vertical location of all facilities previously unrecorded in an owner's drawings, plans or specifications that are discovered in the right-of-way five feet or less from the owner's excavation or facility installation; (2) notify the director and other facility owners of proposed activities in the right-of-way; and (3) meet with the director and other facility owners to schedule adjustment or relocation of facilities. (B) No later than the 14th day before the City begins excavating a City water, wastewater, stormwater, electric facility, and street project, an owner shall provide to the director: (1) the horizontal and vertical location of the owner's underground facilities in the right-of-way located five feet or less from the City's right-of-way assignment; and (2) a condition survey of the owner's underground facilities. (C) Information concerning facilities located in the right-of-way shall be in a format designated by the director. (D) If an owner fails to provide information to the director on or before the 36th day following the director's request, the director may obtain the information and charge the information collection fee prescribed by separate ordinance except as otherwise provided by law.
Source: Ord. No. 20170817-045, Pt. 2, 8-17-17.
