§ 29-36. - Permit required.
No permit shall be issued under this article except in the name of the building/property owner through a State licensed, City registered mechanical, gas or boiler contractor by whom such mechanical, gas or boiler work is to be performed. Permits shall be required for any new construction, maintenance work or for repair work where mechanical systems, gas systems or boilers are altered, replaced or rearranged. Prior to commencement of any mechanical, gas or boiler work the mechanical, gas or boiler contractor shall contact the Development Services Department and obtain a permit. The permit shall include the name of the contractor, job address, permit number, scope of mechanical, and gas or boiler installation proposed. When the permit is requested electronically or by telephone, the contractor's copy shall be sent electronically or mailed to the business address. The permit covers only that work listed thereon. Any additions or changes shall be reported to the Development Services Department and additional inspection fees, as required, shall be assessed prior to requesting final inspection.
(a) Permits shall be required for all boiler, gas or mechanical work, including, but not limited to, the alteration or installation of both new and used mechanical equipment and appliances regardless of size or type, which are listed in the International Mechanical Code or International Fuel Gas Code.
(b) A permit shall be required for all gas services or gas piping systems including medical gas and medical-surgical vacuum systems. Where fuel gas pressure in systems exceed the normal utility delivery pressure, the contractor shall indicate piping installation is for an elevated pressure system.
(c) A permit shall also be required where existing mechanical equipment is to be removed and reinstalled at the same location, where work such as roofing, remodeling, etc., is to be done. Reinstalled mechanical equipment shall comply with the requirements of this Code.
(d) Mechanical, gas, or boiler permits shall be transferable upon approval by the Development Services Department.
(Ord. No. 25053, § 2, 12-16-14, eff. 3-16-15; Ord. No. 26393, § 4, 3-3-20, eff. 4-3-20)