Temporary gas permit.
El Paso City Code § 18.02.105.29.5
in effect18.02.105.29.5 - Temporary gas permit.
A special permit is required when an owner or contractor intends to use fuel gas for temporarily heating a structure or part of a structure before certification of all plumbing or mechanical work. Such permit is required whether the intended use is for all or part of the system of piping, devices and appliances making up the permanent heating system for the structure, or by the use of a temporary system, or by the use of parts of either or both systems.
Such owner or contractor shall make application to the building official on forms provided by the department and shall set out the proposed use of the system, its design and period of use desired.
If the building official finds that such request is reasonable as to design and length of time requested under the conditions existing in the particular case, and that safe conditions of operation of such system can be maintained then the building official shall issue the permit.
(Ord. No. 019528, § 1, 8-1-2023)
Source: City of El Paso, City Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT18BUCO_CH18.02BUCOADCO_18.02.105.29MIPEPR_18.02.105.29.5TEGAPEFetched: 10/28/2026