Duration of a Public Right-of-Way Permit to Excavate Within a Public Street
San Diego Municipal Code § 62.1205
in effect§62.1205 Duration of a Public Right-of-Way Permit to Excavate Within a Public Street
It shall be unlawful for any person or public utility to excavate within the roadway section of a street in the public right-of-way without a valid Public Right-of-Way Permit issued in accordance with Municipal Code section 129.0741. Notwithstanding Chapter 12, Article 9, Division 7 of this Code, a Public Right-of-Way Permit to excavate within the public right-of-way shall be void if the excavation has not begun within 90 calendar days of the start date specified in the permit.
(“Excavation Fee” added 9–22–2003 by O–19215 N.S.)
(Retitled to “Duration of a Public Right-of-Way Permit to Excavate Within a Public Street” and amended 1-2-2013 by O-20231 N.S.; effective 2-1-2013.)
(Amended 5-5-2015 by O-20481 N.S.; effective 6-4-2015.)
(Amended 8-8-2023 by O-21701 N.S.; effective 1-1-2024.)
Source: City of San Diego Office of the City Clerk, San Diego Municipal Code and City Charter (docs.sandiego.gov PDFs)URL: https://docs.sandiego.gov/municode/MuniCodeChapter06/Ch06Art02Division12.pdf#page=5Fetched: 10/28/2026
