Inspections—Basic requirement.
Richmond, Va., City Code § 24-485
in effectSec. 24-485. - Inspections—Basic requirement.
All excavations shall be inspected as specified in the permit. Based upon the complexity and nature of the excavation, inspections may be required during the performance of the excavation, immediately upon completion of the excavation, or both. An inspector approved by the Director shall perform all inspections at the permittee's expense pursuant to rules and regulations promulgated by the Director. The permittee shall arrange for each required inspection, notify the Director of the date and time when each inspection will occur, and direct the inspector to furnish the Director with the written inspection results within the time limits set forth in the permit. Excavation work performed under the permit will not be considered complete until it has passed the final inspection required by the permit.
(Code 2004, § 90-517; Code 2015, § 24-485; Code 2020, § 24-485; Ord. No. 2005-113-55, § 1, 4-25-2005)
Source: City of Richmond, Virginia, Code (2026 recodification) and Charter (Municode Library, library.municode.com)URL: https://library.municode.com/va/richmond/codes/code_of_ordinances?nodeId=PTIICICO_CH24STSIPUWA_ARTVIIEXPURI-W_DIV4COEX_S24-485INASREFetched: 11/8/2026
