Installation of monitoring sites.
Columbus City Codes § 1145.61
in effect1145.61 - Installation of monitoring sites.
Installation of monitoring sites shall be required of any user, upon notification by the Director. A permit-to-install (PTI) package, in accordance with Section 1145.26, for any proposed monitoring and flow measurement facilities shall be submitted to the Director for approval within sixty (60) days after notification by the Director.
Installation of any required facility under this section shall be completed within ninety (90) days of approval of the PTI by the Director. An extension beyond this ninety-day limit may be granted by the Director for good cause.
Any such required facilities shall be constructed, operated, and maintained at the user's expense. The facility and its equipment shall be maintained at all times in a safe and proper operating condition by the user. Access to the monitoring, sampling or flow measurement facilities shall be available at all times in accordance with Section 1145.60 of this chapter.
The Director or authorized representative shall have the right to set up and operate equipment at the facility. All required facilities shall be located on the discharger's premises, whenever possible, and shall be so located as to be readily accessible at all times. Access to the monitoring facilities shall not be obstructed by any object including, but not limited to vehicles, supplies, equipment or buildings. Any user installed equipment must be compatible with city-owned monitoring equipment.
(Ord. No. 1327-2012, § 1, 7-23-2012, eff. 10-1-2012; Ord. No. 2553-2020, § 1, 2-8-2021)