Application
San Diego Municipal Code § 82.25.1
in effect§82.25.1 Application
(a) Any interested person requiring terminal access for interstate trucks from the federally designated highway system shall submit an application, on a form as provided by the City, together with such information as may be required by the City Engineer and appropriate fees to the City of San Diego.
(b) Upon receipt of the application, the City Engineer will cause an investigation to be made to ascertain whether or not the proposed route is adequate to accommodate interstate trucks. Determination of route capability will include, without limitation, a review of adequate turning radii and lane widths of ramps, intersections and highways and general traffic conditions such as sight distance, speed and traffic volumes. No access off a federally designated highway system will be approved without the approval of CALTRANS.
(c) Should the requested route pass through the City of San Diego to a terminal located in another jurisdiction, the applicant shall comply with the jurisdiction’s application process. City of San Diego route designation approval will be required for those portions of the route located within the City. Costs for trailblazer signs shall be as provided in Section 82.25.2(b) below.
(“Application” added 4–22–1985 by O–16405 N.S.)
Source: City of San Diego Office of the City Clerk, San Diego Municipal Code and City Charter (docs.sandiego.gov PDFs)URL: https://docs.sandiego.gov/municode/MuniCodeChapter08/Ch08Art02Division00.pdf#page=9Fetched: 10/28/2026
