PLAN REVIEW AND WORK PERMIT REQUIREMENTS.
Austin City Code § 15-12-14
in effect§ 15-12-14 - PLAN REVIEW AND WORK PERMIT REQUIREMENTS.
Each water well drilled, constructed, repaired, capped or plugged, each water well pump installed or repaired, and any facilities connected to or associated with a water well or pump constructed or altered shall be done so in conformance with all relevant city code provisions, including but not limited to, Chapter 15-1 (Cross Connection Regulations); local building, plumbing and electrical codes within Chapter 25-12 (Technical Codes); and Chapter 6-5 (Water Quality). Any plan review, approval, permit and inspection requirements under these relevant code provisions are applicable to each water well or water well pump related project.
Source: Ord. 20121011-005.
Source: City of Austin, City Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/tx/austin/codes/code_of_ordinances?nodeId=TIT15UTRE_CH15-12WAWE_ART2REWAWEDRWAWEPUIN_S15-12-14PLREWOPEREFetched: 10/27/2026
