El Paso City Code § 18.21.180 Design standards for residential sewerage systems.
18.21.180 - Design standards for residential sewerage systems.
A. House Sewer. The sewer from the house plumbing system to the septic tank shall be constructed of structurally sound pipe such as cast iron, ductile iron, or SDR 35 (or equivalent) plastic pipe with metallic locating tape, bedded in sand. Cast iron, ductile iron, Schedule 40 PVC, or high strength pipe should always be used under driveways. The pipe from the house to the septic tank shall have a minimum inside diameter of not less than four inches and be compatible with the house stub out pipe. The slope of the house sewer shall be no less than one-quarter-inch fall per foot of pipe. The stub out location shall be at the highest possible elevation with respect to the house foundation to avoid deep treatment systems. The line must be of watertight construction. A cleanout plug must be provided within three feet of the building and at ninety-degree turns in alignment, both horizontal and vertical, and at every seventy-five feet of straight horizontal piping. Prospective installers and users of low flush commodes should consult with the manufacturers of these devices regarding their grade requirements. Too steep or too shallow slopes on pipes connecting the toilet and the treatment tank may require excessive maintenance. Piping from the treatment tankage to the disposal area must have at least two inches inside diameter, have at least a minimum fall of one-eighth inch per foot and be as sturdy as SDR 35 PVC piping. Metallic locating tape shall be used with the installation of all piping to and within the disposal area. This tape shall be readily detectable with a metal detector.
B. Septic Tank Capacity Based on Sewage Loading. A properly designed septic sewage tank shall be watertight. The settleable and suspended solids will undergo partial decomposition under anaerobic conditions. As a result of use, the septic tank will accumulate partially decomposed solids which must be removed periodically. As additional sewage is introduced into the tank, partially clarified effluent is discharged into the subsurface disposal field. The best method for estimating the tank's sewage loading is based upon the number of bedrooms in the house. Table 18.21.180 shall be used to determine the required minimum septic tank liquid capacity.
Table 18.21.180
Septic Tank Minimum Liquid Capacities
Number of Bedrooms | Septic Tank Capacity (Gallons)
Two or less | 1,000
Three | 1,000
Four | 1,250
For each additional | 250
Note: The inside liquid depth of the tank shall not be less than 30 inches.
See Table 18.21.230 for calculating the number of bedrooms based on dwelling living area.
Consideration shall be given to increasing total tank capacity if extensive use of kitchen sink waste grinder/disposals is anticipated.
C. Inlet and Outlet Devices. To assure rapid drainage of house plumbing, the flow line of the inlet pipe shall be at least three inches higher than the operating tank liquid level which is determined by the flow line of the outlet pipe. Liquid penetration of the inlet device shall be at least six inches, but never greater than that of the outlet device. Liquid penetration of the outlet device shall be approximately one-fourth to one-half of the tank's liquid depth. T branches are required for inlet and outlet devices because they provide a means for venting the gases produced by the decomposition process from the tank and absorption system through the house plumbing. Otherwise, gases may escape from around the lid of the tank and cause an odor nuisance in the vicinity of the septic tank. T branches also offer ready access for required maintenance. To prevent the escape of floating solids from the tank to the subsurface disposal field and the possibility of inlet stoppages, the open spaces between the tops of the inlet and outlet devices and the underside of the tank cover shall not be greater than four inches, nor less than two inches (See Figure 18.21.180(A)). In order to provide a good watertight septic tank, the inlet and outlet T branches shall be installed in a permanent manner at the time the septic tank is constructed. Factory built tanks shall have the T branches grouted in place before delivery so that the only connections to the tank at the point of installation will be the influent and effluent lines. Manufacturers of prefabricated tanks shall be allowed to install watertight flanges into the tank walls, into which inlet and outlet stubs can be easily fitted by field installers, causing watertight connections.
D. Details of Septic Tank Design.
1. Two single compartment tanks in a series, or a two compartment tank, with approximately one-half to two-thirds of the total volume in the first compartment, will be required for acceptable solids removal. Tanks may be round, rectangular, or of a shape that allows the department's standards to be met. The second tank or compartment shall have inlet and outlet devices designed the same as for a single-com-
[image omitted; see the official code]
partment tank, except that the elevation, or flow line, of the inlet devices in the second unit shall be the same as the outlet device in the first unit (See Figure 18.21.180(B)). A ten-inch minimum diameter or square port shall be provided to each flow line device for inspection, cleaning, and maintenance. Both the inlet and outlet devices shall be accessible for inspection and maintenance without having to enter the septic tank. For tanks not having more than twelve inches of earthen cover, the use of sectional slab covers will conveniently and safely provide the needed access. For tanks buried more than twelve inches, manholes with risers are required. The septic tank shall be of sturdy, watertight construction. Materials used may be steel-reinforced poured-in-place concrete, steel-reinforced pre-cast concrete, reinforced fiberglass, polyethylene, or other materials approved by the licensing authority. Metal septic tanks are prohibited because they are subject to corrosion. The septic tank shall be structurally designed to resist buckling from external hydraulic loading and exterior loading caused by earth fill, garden tractors, riding lawn mowers, or any expected maximum wheel weights. Tanks exhibiting obvious deflections, leaks, or defects that will impair treatment must not be used. Where concrete tanks are installed, sweating, or condensation at construction joints is acceptable.
2. In the case of poured-in-place concrete tanks, septic tank bottoms shall be at least six inches thick with 6 × 6 × 6 gauge welded steel mesh or number three reinforcing bars on six-inch centers, with such reinforcing materials being extended up into the wall area of the tank so that it will mesh with the reinforcing materials in the walls of the tank. The floor and walls must be constructed monolithically. Walls are to be a minimum of six inches thick.
3. Septic tank tops reinforced with 6 × 6 × 6 gauge welded steel mesh or number three reinforcing bars on six-inch centers must be poured off-site rather than on the tank (not on top of a wooden frame over the tank) and must be moved onto the tank after hardening and then sealed to the tank with a permanent bonding material or rubber gasket having a one-half inch minimum thickness so as to form a seal between tank and top. To facilitate handling, tops may be poured in sections but must be sealed when in place. Tops must be a minimum of three inches thick.
4. Precast concrete, polyethylene, and prefabricated fiberglass tanks are subject to prior approval of the licensing authority, who should consult with the department regarding the uniquely differing materials, manufacturing methods, and designs used. All precast or prefabricated tanks shall be clearly marked, tagged, or stamped with the manufacturer's name, an exclusive serial number, and the capacity of such tanks near the level of the outlet in at least two positions so as to be clearly visible to the inspecting or permitting authority even after they have been placed in the ground. Listing of this information with the address of the installation shall be maintained by the licensing authority.
5. Septic tanks must be installed so as to provide at least twelve inches drop in elevation from the bottom of the outlet pipe to the bottom of the disposal area. A sand pad, sandy loam, or select material with a minimum thickness of four inches must be placed under all prefabricated tanks. All septic tank excavations must be backfilled with sand, pea gravel, select backfill, or loam not containing rocks greater than one inch in size. It is acceptable to mound sandy loam over a septic tank which is set high to maintain fall to the drainfield.
6. When treated sewage must be pumped to the disposal area, an effluent pump shall be placed in a watertight tank. A check valve shall be provided if the disposal area is upgrade and higher than the pump. The tank shall be pro-
[image omitted; see the official code]
vided with a highwater alarm having a power circuit separate from the pump. The electrical connections shall be hard-wired, external to the pump chamber. Effluent pump tanks shall have a minimum capacity of five hundred gallons after the alarm is activated.
(Ord. 9448 (part), 1988)