Columbus City Codes § 1137.01 Tapping sewer where property not assessed.
1137.01 - Tapping sewer where property not assessed.
Upon application to tap any sewer built by the city for the purpose of draining the service lateral of any property directly into such sewer, the Director of Columbus Water & Power shall require a fee of forty-five dollars ($45.00) per foot of width of front-footage be paid for the privilege of making such a direct connection from the service lateral to the main or lateral sewer before a permit is issued. This charge shall not be imposed if the owner of the property concerned can show that the owner or the owner's predecessor in title paid, or is paying a special assessment for the construction of the sewer to be tapped or that the sewer to be tapped was constructed at no expense to the sanitary enterprise fund. The number of feet to be paid for shall be determined by one of the following applicable methods:
(1) Lots or parcels of ground having the same width at the front and rear and the same depth on each shall be charged for on the basis of the actual frontage.
(2) Lots or parcels of ground which are irregular shape shall be charged for on the basis of the width of the property as measured on a line forty (40) feet from the front lot line and parallel to the center line of the street upon which property is to face, except that for lots or parcels of ground having curved frontage the width to be charged for shall be measured on a line parallel to and forty (40) feet distant from a line tangent to the curved frontage at a point midway between the sides of the lots or parcels of ground.
The width of front-footage to be paid for shall be determined by the use of an engineer's scale applied to the record drawings of the sewers sought to be tapped, on file in the office of the Division of Water Reclamation, and the widths so determined by the clerk issuing the permit shall be final. The amounts collected shall be deposited to the credit of the sewer fund.
(Ord. 478-92; Ord. 2527-96 § 1; Ord. 1341-2006 § 1 (part); Ord. No. 2019-2021, § 1, 7-26-2021; Ord. No. 3037-2022, § 1, 11-21-2022; Ord. No. 1682-2025, §§ 3, 4, 6-30-2025; Ord. No. 1882-2026, § 1, 6-29-2026)
