Liability for Increased Costs
San Diego Municipal Code § 22.0817
in effect§22.0817 Liability for Increased Costs
Any bidder or contractor who enters into a contract, either directly as a prime contractor or indirectly as a subcontractor, during a period of suspension or debarment imposed upon that bidder or contractor, shall be liable to the City for increased costs incurred as a result of replacing the debarred or suspended bidder or contractor.
(“Liability for Increased Costs” added 8-10-2016 by O-20715 N.S.; effective 9-9-2016.)