Restoration of Moratorium Streets Under Excavation Moratorium Due to Slurry Seal
San Diego Municipal Code § 62.1210
in effect§62.1210 Restoration of Moratorium Streets Under Excavation Moratorium Due to Slurry Seal
Excavators shall slurry seal in moratorium streets due to slurry seal and within 180 working days after the City Engineer’s acceptance of the repair work as follows:
(a) Where the excavation is in the direction of traffic, the excavator shall slurry seal the street from curb to curb, or where a raised median is present, from the curb to the median for the length of the excavation and the excavation influence area.
(b) Where the excavation is perpendicular to the direction of traffic, the excavator shall slurry seal the street from curb to curb, or where a raised median is present, from the curb to the median for the length of the excavation and the excavation influence area.
Table 62-12B
The excavation influence area extends around the perimeter of the excavation as follows:
Street Classification | Wet Utilities | Dry Utilities
Arterial Streets | 62 inches | 51 inches
Major Streets | 71 inches | 55 inches
Collector Streets | 82 inches | 43 inches
Residential Streets | 74 inches | 46 inches
(“Repair of City Excavation” added 9–22–2003 by O–19215 N.S.)
(Retitled to “Excavations on Streets Under a Excavation Moratorium Due to Slurry Seal” and amended 1-2-2013 by O-20231 N.S.; effective 2-1-2013.)
(Renumbered from Section 62.1209 to Section 62.1210, retitled from “Excavations on Streets Under Excavation Moratorium Due to Slurry Seal” to “Restoration of Moratorium Streets Under Excavation Moratorium Due to Slurry Seal” and amended 8-8-2023 by O-21701 N.S.; effective 1-1-2024.)
Source: City of San Diego Office of the City Clerk, San Diego Municipal Code and City Charter (docs.sandiego.gov PDFs)URL: https://docs.sandiego.gov/municode/MuniCodeChapter06/Ch06Art02Division12.pdf#page=9Fetched: 10/28/2026
