Low-bid award
19 V.S.A. § 2605
in effect2605. Low-bid award
If the basis of the award of responsive proposals is low-bid, then each proposal, including the price or prices, shall be sealed by the proposer and submitted to the Agency as one complete package. The Agency shall award the design-build contract to the proposer that submits a responsive proposal with the lowest cost, if the proposal meets all request-for-proposals requirements.
Added 2009, No. 50, § 84.
Source: Vermont General Assembly (legislature.vermont.gov)URL: https://legislature.vermont.gov/statutes/section/19/026/02605Fetched: 10/21/2026
