Issuance of recovery permit -- Criteria -- Conditions.
Utah Code § 73-3b-205
in effect73-3b-205. Issuance of recovery permit -- Criteria -- Conditions.
The state engineer:
(1) shall issue the recovery permit if the state engineer determines that:
(a) the proposed recovery of artificially recharged water will not impair any existing water right;
(b) the applicant is the holder of an approved recharge permit or recovery permit, or if the applicant does not hold the recharge permit, has a valid agreement with the owner of the recharge permit to divert and use the recovered water; and
(c) the recovery point of diversion is located within the area of hydrologic impact of the recharge project, as determined by the state engineer; and
(2) may attach to the permit any conditions the state engineer determines are appropriate.
Amended by Chapter 107, 2010 General Session
Source: Utah Office of Legislative Research and General Counsel (le.utah.gov)URL: https://le.utah.gov/xcode/Title73/Chapter3B/73-3b-S205.html?v=C73-3b-S205_1800010118000101Fetched: 10/26/2026
