FILL REQUIREMENTS.
Austin City Code § 30-5-342
in effect§ 30-5-342 - FILL REQUIREMENTS.
(A) Fill on a tract of land may not exceed four feet of depth, except:
(1) in an urban watershed;
(2) in a roadway right-of-way;
(3) under a foundation with sides perpendicular to the ground, or with pier and beam construction;
(4) for construction of a water quality control or detention facility and appurtenances for conveyance such as swales, drainage ditches, and diversion berms, if:
(a) the design and location of the facility within the site minimize the amount of fill over four feet;
(b) the fill is the minimum necessary for the appropriate functioning of the facility; and
(c) the fill is not located on a slope with a gradient of more than 15 percent or within 100 feet of a classified waterway;
(5) for utility construction or a wastewater drain field; or
(6) in a state-permitted sanitary landfill located in the extraterritorial jurisdiction, if:
(a) the fill is derived from the landfill operation;
(b) the fill is not placed in a critical water quality zone or a 100-year floodplain;
(c) the landfill operation has an erosion and restoration plan approved by the single office; and
(d) all other applicable City Code and County Code provisions are met.
(B) A fill area must be restored and stabilized.
(C) Fill for a roadway must be contained within the roadway clearing width described in Section 30-5-322 (Clearing For A Roadway).
Source: City Code Section 25-8-342; Ord. 031211-11; Ord. 031211-42; Ord. No. 20170615-102, Pt. 48, 6-15-17.