For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.23.030 — Definitions

Riverside Municipal Code (Supp. No. 33: codified through Ordinance No. 7776, enacted June 23, 2026) · Riverside Municipal Code § 16.23.030

Corpus is an independent public-information project, not the official City of Riverside website. Stable reference URL

16.23.030 - Definitions.

For the purpose of this chapter, words and terms shall be defined as set forth in this section. Where terms are not defined in this Code and are defined in other codes, such terms shall have the meanings ascribed to them as in those codes. Where terms are not defined through the methods authorized by this section, such terms shall have ordinary accepted meanings such as the context implies. Electric vehicle charging station means the following: A. Any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle. Electronic Submittal means the utilization of the following: A. Any computer based electronic plan review software maintained, operated, and utilized by the City while receiving applications through the internet. Hydrogen fueling station means the following: A. Equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Specific adverse impact means the following: A. A significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies or conditions as they existed on the date the application was deemed complete.

(Ord. 7748, § 44, 2025; Ord. 7348 §1, 2016)