§ 19-64 — Meter installation fees; when additional fees required
Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Code of Ordinances § 19-64
Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference URL
§ 19-64 - Meter installation fees; when additional fees required.
The city will charge to each prospective consumer requesting water service a meter installation fee to defray the city's cost of the meter, meter appurtenances and cost of installation. The meter installation fee shall be in accordance with the meter installation fee schedule published by the city. The city will require the payment of the meter installation fee concurrently with the request by prospective consumers for the meter installation. The meter installation fee shall be charged only one time for the installation of a meter of any one location; provided, however, that requests to exchange existing meters for meters of a larger size will result in a charge to the prospective consumer of the difference between the existing smaller size meter and the requested larger size meter. Meter installation fees for meters of a large size, special type or requiring vault installation, not shown on the city's published schedule, shall be determined by the City Engineer.
(Ord. 24-75, § 11, 5-5-1975)
