For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 106 — Approval

Baltimore City Code (current through Ord. 26-129 (July 17, 2026); publication of Oct. 18, 2026) · Baltimore City Code, Building Codes, Part VII, Section 106

Corpus is an independent public-information project, not the official City of Baltimore website. Stable reference URL

Section 106. Approval

106.1 Modifications. {As in IPMC} 106.2 Alternative materials and methods. The provisions of this Code are not intended to prevent the installation of any material or to prohibit any method of construction not specifically prescribed by this Code, as long as that alternative has been approved. An alternative material or method of construction may be approved if the Code Official finds in writing that, for the purposes intended: 1. the proposed alternative is satisfactory and complies with the intent of this Code, and 2. the material, method, or work offered is at least the equivalent of that prescribed in this Code in quality, strength, effectiveness, fire resistance, durability, and safety. 106.3 Required testing. {As in IPMC} 106.4 Used material and equipment. {As in IPMC} 106.5 Approved materials and equipment. {As in IPMC} 106.6 Research reports. {As in IPMC}

(Ord. 24-341 Section 1.)

§ 106 — Approval | Baltimore, MD City Code (current through Ord. 26-129 (July 17, 2026); publication of Oct. 18, 2026) | Corpus