For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3-26 — Engineering report

Baltimore City Code (current through Ord. 26-129 (July 17, 2026); publication of Oct. 18, 2026) · Baltimore City Code, Article 7, § 3-26

Corpus is an independent public-information project, not the official City of Baltimore website. Stable reference URL

§ 3-26. Engineering report.

(a) Report required. Any proposal to offset the effect of development in the Floodway by construction of stream modifications must be documented by an engineering report, prepared by a licensed professional engineer, that fully evaluates the effects of the construction and is submitted with the application for a building permit. (b) Basis. As the basis of analysis, the report must use the base flood and floodway data prepared by the Federal Emergency Management Agency.

(Ord. 14-208; Ord. 11-516; Ord. 88-188.)