For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-2061 — APPLICATION

Code of the City of Raleigh (Supp. No. 69: codified through Ordinance No. (2025) 802, adopted October 21, 2025) · Raleigh City Code § 8-2061

Corpus is an independent public-information project, not the official City of Raleigh website. Stable reference URL

Sec. 8-2061. - APPLICATION.

Any person owning or proposing to construct any private utility line or system inside or outside the corporate limits of the City which it is desired to have connected with the public utility lines and systems of the City shall make written application for permission to make such connections, upon forms furnished by the Raleigh Director of Public Utilities or his designee. Applications will be received and acted upon in accordance with the provisions of this article. The application must contain a preliminary utility plan which shall be prepared by a professional engineer registered to practice in the State of North Carolina. The application must also be accompanied by a map made by a professional engineer or registered land surveyor authorized to practice in the State, which map shall show accurately the property to be served with water and/or sewer service, and, if within any real estate development or subdivision, the map shall show the property lines and subdivision of lots and the layout of streets therein. When the private utility lines or systems are to be laid and constructed within any subdivision, such subdivision and the map thereof showing the property lines and subdivision of lots and the layout of streets must have been duly approved in accordance with Chapter 3, Part 10 of this Code before the approval of any application for permission to make connections with the utility system of the City. Unless the Raleigh Director of Public Utilities or his designee has information that indicates that there is adequate existing sewer capacity to meet the needs of the property for which sewer service is sought, the application shall also include a downstream sewer capacity analysis that demonstrates that there is capacity along the tributary wastewater path from the property to the wastewater treatment plant. A main extension permit application fee and, if applicable, pump station permit fee as set forth in the Raleigh Water Fee Schedule shall paid by the developer at the time engineering plans are submitted for review.

(Ord. No. 1985-543, §25, 4-16-85; Ord. No. 1986-778, §1, 5-6-86; Ord. No. 1991-781, §1, 5-21-91; Ord. No. 2002-196, §1, 5-7-02; Ord. No. 2014-262, §28, 1-21-14, eff. 1-26-14; Ord. No. 2020-96, §13, 6-15-20, eff. 7-1-20)