For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15-12-14 — PLAN REVIEW AND WORK PERMIT REQUIREMENTS

Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 15-12-14

Corpus is an independent public-information project, not the official City of Austin website. Stable reference URL

§ 15-12-14 - PLAN REVIEW AND WORK PERMIT REQUIREMENTS.

Each water well drilled, constructed, repaired, capped or plugged, each water well pump installed or repaired, and any facilities connected to or associated with a water well or pump constructed or altered shall be done so in conformance with all relevant city code provisions, including but not limited to, Chapter 15-1 (Cross Connection Regulations); local building, plumbing and electrical codes within Chapter 25-12 (Technical Codes); and Chapter 6-5 (Water Quality). Any plan review, approval, permit and inspection requirements under these relevant code provisions are applicable to each water well or water well pump related project.

Source: Ord. 20121011-005.