10.12.070 - Construction permit.

A. No person shall construct or make any modification to any water recreation facility without first obtaining a permit from the Director therefor. B. In order to secure a permit, the owner, operator or a contractor, engineer or architect on their behalf, shall file an application with the Director, accompanied by the information contemplated by SMC Section 10.01.090, WAC 246-260-030, and any Director's rule, and the permit fee. The Director shall review the plans for the water recreation facility. The Director may approve, reject or request more needed information, or require modifications or impose conditions consistent with this chapter. All construction shall be in full compliance with State law and implementing Rules, and with this Code. The Director should make a decision within thirty (30) days of a complete submittal. C. The owner or operator may elect to continue to use a water recreation facility which: 1. Existed on July 27, 1987, maintains a "grandfather privilege" under RCW 70.90.160, and complies with statutory and ordinance requirements in effect when constructed, or 2. Was constructed between July 27, 1987, and April 12, 1990, and complies with SMC Chapter 22.906, RCW 70.90, and WAC Chapter 246-260 as then existing, although the facility is not in full compliance with current design, construction and equipment requirements, as long as the facility is operated in continuous compliance with the lifesaving requirements in WAC 246-260-050(2), and the water quality and sanitation requirements of this Code, and satisfies the barrier requirements of WAC 246-260-050(3), or is the subject of an administrative authorization or dispensation. Any modification involving construction or installation of new equipment shall comply with this Code.

(Ord. 117092, § 1, 1994.)