For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

VIII — REQUIREMENTS FOR EV CHARGING INFRASTRUCTURE

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026), Hayward, CA · 7 sections. Independent public-information project, not the official City of Hayward website.

  1. § 10-2.800 — ELECTRIC VEHICLE (EV) CHARGING SPACES
  2. § 10-2.810 — ELECTRIC VEHICLE CHARGING REQUIREMENTS BY USE
  3. § 10-2.820 — DIRECT CURRENT FAST CHARGING STATIONS
  4. § 10-2.830 — RECEPTACLE CONFIGURATIONS
  5. § 10-2.833 — EV CHARGER CONNECTORS
  6. § 10-2.835 — ELECTRIC VEHICLE CHARGING STATIONS (EVCS)—POWER ALLOCATION METHOD
  7. § 10-2.840 — EXCEPTIONS