For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.101K.070 — Special Regulations for D-DT Work/Live Nonresidential Facilities

Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Planning Code § 17.101K.070

Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/38b4eeec-f098-4814-9aef-ade570d9ee06

17.101K.070 - Special Regulations for D-DT Work/Live Nonresidential Facilities.

A. Definition of a D-DT Work/Live Unit. D-DT Work/Live Units are units contained within D-DT Work/Live Nonresidential Facilities that are designed to contain working space with accessory living space, are used for living and working, and meet the requirements of this Section. B. A D-DT Work/Live Nonresidential Facility must meet all applicable regulations contained in this Section. Section 17.102.190 relating to the conversion of buildings originally designed for Commercial or Industrial Activities into Joint Living and Working Quarters (JLWQs) does not apply to the D-DT Zones. C. D-DT Work/Live Units are Nonresidential Facilities and counted towards the nonresidential Floor Area Ratio, not the residential density. D. All D-DT Work/Live Units shall be designed under the Building Code to accommodate customers and employees. In the D-DT-AG and D-DT-PM Zones, D-DT Work/Live Units shall be designed under the Building Code to allow Manufacturing Activities. E. At least two-thirds of each unit shall be designated for working activities. Working and living activities shall be designated according to the following requirements: 1. In unpartitioned kitchens or work areas that include kitchen fixtures and appliances, the following areas are considered living space: the counters, cabinets, eating space, sink and appliances in the area that will function as a kitchen and the floor area that is four (4) feet in front these items. 2. If there is only one bathroom, half the bathroom shall be counted as living space and half shall be counted as workspace. Otherwise, bathrooms are counted as living space if their access is through living space. For instance, a bathroom in a loft is considered living space if the loft is a sleeping area. If the bathroom is accessed directly from the workspace, the bathroom shall be counted as workspace. If accessed directly from both, half the bathroom is considered living space and the other half commercial. 3. Interior hallways and closets shall be counted as part of the space to which they are adjacent. 4. Living and working spaces shall be within the same Work/Live Unit and be directly connected. 5. To accommodate flexible work activities, working areas shall be open and with as few interior walls as possible. "Offices" enclosed by four walls are considered living space because they are indistinguishable from bedrooms and cannot be used flexibly for different working activities. 6. All ground-floor units adjacent to the front façade shall have a street entrance directly into the working area. For these units, the working area shall be adjacent to the street right-of-way. F. Regular Design Review required. Establishment of a D-DT Work/Live Unit are only permitted upon determination that the proposal conforms to the Regular Design Review criteria set forth in the Design Review Procedure in Chapter 17.136 and to each of the following additional criteria: 1. Units on the ground-floor level of a building have a business presence on the street, including signage. For units in Commercial Zones, this includes a storefront-style façade as described in Section 17.101K.130(d). For units in Industrial Zones, this includes extra wide entrances and, if feasible, roll-up doors. For units in Residential Zones, this includes a business door that is oriented towards the street. 2. The layout of nonresidential floor areas within a Work/Live Unit provides a functional open area for working activities. 3. The floor and site plan for the project includes an adequate provision for the delivery of items required for a variety of businesses, including artist's work. This may include, but is not necessarily limited to, the following: a. Service elevators designed to carry and move oversized items; b. Extra-large slop sinks; c. Doors, corridors, and stairwells wide and/or straight enough to deliver large items; and d. Loading areas located near stairs and/or elevators. G. Activity, auto parking, bicycle parking, loading, open space, and unit size standards. Table 17.101K.03 below prescribes special regulations for D-DT Work/Live Units in applicable D-DT zones. Table 17.101K.03 Special Regulations for D-DT Work/Live Units Standard | Requirement | Notes Activities allowed in a Work/Live Unit | Same permitted and conditionally permitted activities as described in Section 17.101K.050 for the applicable primary zone. For Residential Zones, activities permitted as Home Occupations are also permitted. Chapter 17.112 contains the Home Occupation regulations. Minimum size of a Work/Live Unit | 800 square feet Required auto parking | No auto parking spaces required Required bicycle parking | One long-term space for each unit; minimum requirement is four long-term spaces. Five short-term spaces for each 20 units; minimum requirement is four short-term spaces. | 1 Required usable open space | For new D-DT Work/Live Units that are completely or partially outside the envelope of an existing building, the usable open space requirements for regular dwelling units are applied (see Section 17.101K.150 for these open space requirements). No additional usable open space is required for D-DT Work/Live Units that are completely within the envelope of an existing building. For these conversions, maintaining existing usable open space to at least the minimum standards for regular dwelling units is required. Required loading | 1, 2 Less than 50,000 sf. | No berth 50,000—199,999 sf. | One berth 200,000 sf. or more | Two berths Notes: 1. See Chapter 17.117 for bicycle parking standards. 2. Loading requirements apply to new construction only. For conversion of existing buildings, maintaining existing loading to at least these minimum number of berths is required. Also, see Chapter 17.116 for loading standards.

Ask a question about Oakland law

Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.