For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Chapter 13.04 — POWER RATES AND REGULATIONS

Pasadena Municipal Code, California (Supp. No. 79: codified through Ordinance No. 7469, enacted May 18, 2026), Pasadena, CA · 40 sections. Independent public-information project, not the official City of Pasadena website.

  1. § 13.04.010 — Short title
  2. § 13.04.020 — Definitions
  3. § 13.04.030 — Light and power rate standards
  4. § 13.04.031 — Pricing, pricing periods, and seasons
  5. § 13.04.040 — Residential single-family service (Schedule R-1)
  6. § 13.04.045 — Residential multi-family service (Schedule R-2)
  7. § 13.04.046 — Electric utility assistance program (EUAP)
  8. § 13.04.050 — Small commercial service (Schedule S-1)
  9. § 13.04.060 — Medium commercial service—secondary (Schedule M-2)
  10. § 13.04.064 — Medium commercial service—primary (Schedule M-1)
  11. § 13.04.067 — Large commercial and institutional service—secondary (Schedule L-2)
  12. § 13.04.069 — Large commercial and institutional service—primary (Schedule L-1)
  13. § 13.04.070 — Extra-large commercial and institutional service—primary (Schedule L-3)
  14. § 13.04.071 — Special load management and conservation service
  15. § 13.04.074 — Electric vehicle charging rates (Schedules EV-1, EV-2, EV-3, and City-owned retail charging stations)
  16. § 13.04.075 — Long-term contracts
  17. § 13.04.080 — Standby service (Schedule SBY)
  18. § 13.04.085 — Unmetered rates—non-demand below 30 kW (Schedule CE-1)
  19. § 13.04.087 — Unmetered rates—demand at or above 30 kW (Schedule CE-2)
  20. § 13.04.090 — Street lighting and traffic signal service (Schedule SL)
  21. § 13.04.100 — Service regulations and charges
  22. § 13.04.110 — Meter and service installation
  23. § 13.04.120 — Inspections
  24. § 13.04.125 — Private underground electric vaults
  25. § 13.04.130 — City not liable for damages relating to delivery failures
  26. § 13.04.140 — Financial responsibility—Delinquency penalty
  27. § 13.04.150 — Rate schedule changes
  28. § 13.04.160 — Meter readings combined
  29. § 13.04.170 — Transmission services charge
  30. § 13.04.173 — Power cost adjustment (PCA)
  31. § 13.04.175 — Reserve for working capital
  32. § 13.04.177 — Net energy metering
  33. § 13.04.178 — Self-generation service (Schedule SG)
  34. § 13.04.179 — Green power service (Schedule GP)
  35. § 13.04.180 — Theft of energy
  36. § 13.04.190 — Apparatus causing interference
  37. § 13.04.200 — Billing procedure
  38. § 13.04.210 — Gaseous lighting units
  39. § 13.04.220 — Added load
  40. § 13.04.230 — Public benefit charge