Chapter 7 — Public Sewer Construction
Visalia, California, Municipal Code (2026 S-50: Municipal Code contains Supplement, current through Ordinance 2025-15, passed 12-15-2025), Visalia, CA · 18 sections. Independent public-information project, not the official City of Visalia website.
- § 13.08.300 — Permit required
- § 13.08.310 — Plans, profiles and specifications required
- § 13.08.320 — Subdivision
- § 13.08.330 — Easements or rights-of-way
- § 13.08.340 — Persons authorized to perform work
- § 13.08.350 — Grade stakes
- § 13.08.360 — Compliance with local regulations
- § 13.08.370 — Protection of excavation
- § 13.08.380 — Design and construction standards
- § 13.08.390 — Bond--Public sewer construction
- § 13.08.400 — All work to be inspected
- § 13.08.410 — Notification
- § 13.08.420 — Correct notices
- § 13.08.430 — All costs paid by owner
- § 13.08.440 — Contract with outside industrial and commercial users
- § 13.08.450 — Street excavation permit
- § 13.08.460 — Liability
- § 13.08.470 — Time limit on permits
