II — CONSTRUCTION, EXCAVATION, AND REPAIR

Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026), Miami, FL · 23 sections. Independent public-information project, not the official City of Miami website.

  1. § 54-41 — Lines and grades for sidewalk, curb, etc., construction
  2. § 54-42 — Permit required for disturbing, cutting into, digging up, drilling, boring under, or excavating any public street, swale, or sidewalk; cost of restoration; obstruction of right-of-way
  3. § 54-43 — Permit fees for right-of-way or street excavation, sidewalk repair, paving or resurfacing of roadway, parkway or shoulder area, building line and grade survey, sidewalk construction survey, driveway construction, utility placement; underground utility service connection excavation, groundwater monitoring wells; permit renewal; after-the-fact permit, and inspection/reinspection fees; waiver of fees
  4. § 54-44 — Material for sidewalk construction
  5. § 54-45 — Type and specifications for street paving
  6. § 54-46 — Agreement and bond as to right-of-way and subdivision improvements by persons submitting plats, replats, etc., to commission
  7. § 54-47 — Approval of location and construction of driveways, etc
  8. § 54-48 — Inspection of work
  9. § 54-49 — Obstructing street with materials
  10. § 54-50 — Reports of approval
  11. § 54-51 — Grades for street utilities, trees, etc
  12. § 54-52 — Sewers, conduits, etc., to be laid before city paves street
  13. § 54-53 — Closing of streets during progress of work
  14. § 54-54 — Allowing sidewalks, swales and curbs to remain in dangerous condition
  15. § 54-55 — Notice to repair sidewalks, driving lanes, parking lanes, swales and curbs
  16. § 54-56 — Construction, reconstruction or repair of street improvements required when adjacent property is improved by construction of $100,000.00 or more in value or exceeding 1,000 square feet in floor area; restriction
  17. § 54-57 — Obstructing streets or sidewalks with trash, lumber, etc
  18. § 54-58 — Right-of-way dedication required prior to issuance of permits
  19. § 54-59 — Enhanced right-of-way improvement trust fund—Intent
  20. § 54-60 — Established
  21. § 54-61 — Trust fund payments
  22. § 54-62 — Financial report
  23. § 54-63 — Recovery agreement for construction of master planned street