For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Chapter 2 — Specific permit application requirements and review procedures

Code of Ordinances, City of Tampa (Supp. No. 148: codified through Ordinance No. 2025-152, enacted December 18, 2025), Tampa, FL · 9 sections. Independent public-information project, not the official City of Tampa website.

  1. § 22-324 — Permits required
  2. § 22-325 — Permit duration
  3. § 22-326 — Provision and filing of as-built surveys
  4. § 22-327 — Permit types; pre-application conference; application requirements; general review procedures
  5. § 22-327.1 — Permit for collocation of small wireless facilities on existing non-authority utility pole
  6. § 22-327.2 — Permit for new non-authority utility pole to support small wireless facilities
  7. § 22-327.3 — Permit for collocation of small wireless facilities on authority pole
  8. § 22-328 — Design standards
  9. § 22-329 — Waiver of objective design standards for small wireless facilities