Sec. 16-18L.004. - Application procedures.

1. Special administrative permit (SAP) application. a. All exterior demolition, new construction (including additions to existing buildings), monument signs, modification or subdivision of prior unified development plans, modifications of amenity zones, walk zones or pedestrian ways, modifications of outdoor dining, movement or removal of private streets that function as public streets utilized to satisfy block area calculations for any property within the district, or any construction which results in increased lot coverage, modification of a building footprint, or modification of building façades that alters the configuration of openings or public access shall be subject to special administrative permit (SAP) approval. For such SAP approval, an SAP application and a specified number of copies each of a site plan, landscape plan, and elevation drawings of each exterior façade shall be submitted, as applicable, and approved by the director prior to an applicant filing for a building permit. b. An applicant shall arrange a conference to discuss the application and the requirements of this chapter with the director prior to SAP submittal. Such meeting shall be held within 14 days of the date of the request by the applicant, unless a longer period is agreed upon by the applicant and director. c. All SAP applications shall be processed in accordance with the standards and procedures applicable to SAP applications contained in Chapter 25 except as otherwise modified by this Chapter 18L. The director shall provide a written response to the applicant within 30 days of the date of the completed SAP application as provided in section 16-25.004. d. Where regulations require variance, special exception or special use permit action, the SAP for building permit purposes shall not be issued until the necessary approval has been obtained for such variance, special exception or special use permit. 2. Administrative variations. a. As part of general action when plans require approval of an SAP, the director may authorize variations from regulations generally applying based on written findings, to be filed as a public record, that either: i. A plan proposed by an applicant, while not strictly in accordance with regulations applying generally within the district, satisfies the public purposes and intent of such regulations, and provides public protection to an equivalent or greater degree than strict enforcement of such regulations would provide; or ii. In the particular circumstances of the case, strict application of a particular regulation or regulations is not necessary for the accomplishment of public purposes or the provision of public protection, at that time or in the future. b. Parcels abutting Peachtree Road that become out of compliance with these SPI-12 zoning regulations, including existing site plans that were approved prior to the effective date of this chapter as a direct result of the construction of the Peachtree Corridor Project, shall be permitted to utilize the provisions for variations provided in section 16-18.L.004 to request administrative site plan amendments without further city council review to administratively correct said compliance discrepancies as to said elements. This subsection (b) shall not be construed or utilized so as to exceed or increase the pre-construction development permission of any such parcel. 3. Prohibited variances: Notwithstanding any provision in this chapter or part to the contrary, neither administrative variation nor variance by the board of zoning adjustment shall be authorized from this chapter's building height requirements or block area formula. Alterations to block area calculations based upon construction of new authorized street types, and recalculations of the square footage of an individual block area based upon more accurate survey data, shall be authorized by administrative variation consistent with SPI-12 requirements. Changes to transitional height requirements shall not be authorized by administrative variation but requests for variance from transitional height requirements shall be only through application to the board of zoning adjustment.

(Ord. No. 2012-23(12-O-0228), § 1(Attach. A), 5-30-12)