D — EXCAVATIONS
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20), Savannah, GA · 25 sections. Independent public-information project, not the official City of Savannah website.
- § 4-1071 — Permit required
- § 4-1072 — Plans and specifications
- § 4-1073 — Bonds required
- § 4-1074 — Supervision of work
- § 4-1075 — Protection of existing structures, pipelines, etc
- § 4-1076 — Protection of trees, shrubs, etc
- § 4-1077 — To be made with vertical walls
- § 4-1078 — Maximum size of pavement openings
- § 4-1079 — Trenches in pavement not be kept open more than five days
- § 4-1080 — Needless interference with travel prohibited
- § 4-1081 — Repaving and replacing of materials generally
- § 4-1082 — Restoration by city
- § 4-1083 — Backfill—How made
- § 4-1084 — Same—Inspection required
- § 4-1085 — Same—Notice when inspection desired
- § 4-1086 — Replacing surface of unpaved streets and alleys
- § 4-1087 — Restoration of unpaved sidewalk, banquette, etc., areas
- § 4-1088 — Ditches or trenches near curbline
- § 4-1089 — Cutbacks—For paved streets and alleys
- § 4-1090 — Same—For concrete sidewalks
- § 4-1091 — Safety measures—Generally
- § 4-1092 — Same—Covers
- § 4-1093 — Notice to city when work completed
- § 4-1094 — Settlements after repaving
- § 4-1095 — Adherence to city specifications and details
