§ 14A-5-502.5 — Electrical inspections
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 14A-5-502.5
Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/26b73386-c1ac-4117-8f50-c0f12114ffaa
14A-5-502.5 Electrical inspections.
The permit holder must notify the building official when electrical work done pursuant to a permit is ready for the following types of inspections: 1. Rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all electrical raceway is roughed-in, and before the installation of wall or ceiling membranes. 2. Final inspection, after all electrical fixtures are in place and properly connected and the work area is ready for occupancy. (Amend Coun. J. 6-25-21, p. 32180, Art. I, § 10)
Ask a question about Chicago law
Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.
