§ 5-2A-1 — OCCUPANCY PERMITS:
Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 5-2A-1
Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/8112af0a-72fe-4b86-9301-dea4d0107200
5-2A-1: - OCCUPANCY PERMITS:
1. Permit Required: 1.1. No new, remodeled or moved building or structure shall be occupied until a permit for such occupancy has been issued by the Director of Transportation, Engineering and Development or their designee as hereinafter provided. 1.2. No builder, developer, carpenter, contractor or other tradesman shall deliver possession of a new, remodeled or moved building or structure to the proposed occupants of such building or structure until an occupancy permit has been issued by the Director of Transportation, Engineering and Development or their designee as hereinafter provided. 1.3. No realtor, leasing agent or owner of a new, remodeled or moved single-family residential building or structure or of any nonsingle-family building or structure shall deliver possession of the whole or any part of such building or structure to any tenant or lessee until an occupancy permit has been issued by the Director of Transportation, Engineering and Development or their designee as hereinafter provided. 2. Facilities Required For Occupancy Permit: Unless authorized by the City Council and except as may be otherwise provided in an applicable owner's acknowledgment and acceptance (OAA), annexation agreement or permit agreement, no occupancy permit for any new, remodeled or relocated building or structure, including, but not limited to, a residential, commercial and office buildings and structures shall be issued unless: 2.1. All plumbing and electric wiring has been completely installed for permanent service; water supply service presently exists through a permanent connection with the City's water supply system in accordance with Title 8 of this Code; and sanitary sewer service presently exists through a permanent connection with the City's sanitary sewage disposal system in accordance with Title 8 of this Code; and 2.2. All improvements required by this Title and Title 7 of this Code have been installed and accepted by the City Council; provided, however, that required street improvements may be in the process of installation if the building or structure to be occupied is directly adjacent to and accessible from a hard surface roadway of sufficient width, strength and composition to permit reasonably unimpaired access by authorized emergency, utility service, snow removal and waste removal vehicles in all weather conditions; and 2.3. All private and public sidewalks required to be constructed on the lot have been installed and accepted in accordance with this Title and Title 7 of this Code; and 2.4. The structure is in conformance with this Title. 3. Application: 3.1. When any principal building or structure has been completed, the owner or their agent shall file with the Chief Building Official an application for occupancy permit. Upon such application being filed, the Chief Building Official shall make an inspection of the building or structure, and if they find the same in compliance with the provisions of this Chapter and all other applicable provisions of this Title, they shall then issue an occupancy permit therefor. If such permit is not issued in accordance with the provisions hereof, the Chief Building Official shall promptly return the application to the applicant with a memorandum of their reasons for refusing to issue the permit. 4. Compliance With Engineering Plans: 4.1. As Built Drawings And Engineer's And Land Surveyor's Statements Required: Not less than five (5) days prior to the filing of the application required by Subsection 5-2A-1.3 of this Section, the applicant shall file with the Chief Building Official "as built" drawings for all structures, which drawings shall include: 4.1.1. A statement from a registered professional engineer certifying that the final grading of the construction site has been completed in substantial conformance with the final engineering plans approved for the construction site pursuant to Chapter 7 of this Title. 4.2. Drawing, Type 2 Lots: For "type 2" lots as defined in this Section, in addition to the statement required by Subsection 5-2A-1.4.1 of this Section, the registered professional engineer shall also submit a written drawing or sketch prepared by or under their direction which shall have denoted thereon: 4.2.1. The location of the principal structures located on the site; 4.2.2. The grade elevations designed for said site as shown on said final approved engineering plans; and 4.2.3. The measured field elevations which demonstrate that said site, as finally graded, is in substantial conformance with said final approved engineering plans. 4.3. Optional Type 2 Lot Certificate: The applicant may obtain a final occupancy certificate pursuant to the terms of this Subsection by filing with the Chief Building Official not less than five (5) days prior to the filing of the application required by Subsection 5-2A-1.3 of this Section: 4.3.1. "As built" drawings, 4.3.2. Statements from a registered professional engineer, and 4.3.3. A type 2 lot certificate signed and sealed by both a registered professional engineer and a registered professional land surveyor. 4.4. Topographical Survey, Type 1 Lots: For "type 1" lots as defined in this Section, in addition to the "as built" drawings and the statements required by Subsection 5-2A-1.4.1 of this Section, the registered professional engineer shall also submit a topographical survey of the construction site, as finally graded which demonstrates that said site, as finally graded, is in substantial conformance with said final approved engineering plans by having denoted thereon: 4.4.1. The location of the principal structures located on the site; 4.4.2. The grade elevations designed for said site as shown on said final approved engineering plans. 4.5. Definitions: "Type 1" lots shall be defined as any lot which is adjacent to a flood route or a drainage swale, which transports water runoff to or from a detention facility, which drains from the rear of the lot to the front of the lot, which is adjacent to a storm water facility, floodplain or floodway, or which is determined by the City Engineer to present a substantial likelihood of flooding, erosion or damage to other property in the vicinity if not graded in accordance with generally accepted engineering principles. "Type 2" lots shall be defined as any lot other than a type 1 lot. 4.6. Proof Of Compliance: No occupancy permit shall be issued for any structure unless the survey or statement required by this Subsection 5-2A-1.4 of this Section shows full compliance with the intent of the final engineering plans approved for the construction site pursuant to Chapter 7 of this Title, as amended. The applicant shall be responsible for procuring and paying for any required topographical survey and professional registered engineer's statement. 5. Temporary Occupancy; Merchandising/Employee Training: 5.1. A temporary occupancy permit may be issued in accordance with the provisions of this Subsection for the specific purposes of allowing proposed occupants to stock shelves, train employees, and move in furniture needed to conduct business. Such temporary permit shall under no circumstances be construed to allow occupancy of the structure by the general public. 5.2. A temporary occupancy permit for merchandising or training may be issued by the Director of the Department of Transportation, Engineering, and Development or their designee only after approval of the appropriate fire/life safety requirements, including, without limitation, sprinkler systems, alarm systems, and exit requirements, and the Chief Building Official has determined that any nonfire/life safety deficiencies remaining with the structure can be corrected within fifteen (15) days of the date of issuance of this permit. 5.3. A temporary occupancy permit for merchandising or training shall be valid for a period not to exceed fifteen (15) days, at which time the applicant must either obtain a final occupancy permit or immediately cease any activities within the building conducted pursuant to said permit. The permit can be renewed for one additional period of fifteen (15) days, if the Director of the Department of Transportation, Engineering, and Development or their designee agrees that weather or other uncontrollable circumstances prohibited the completion of the remaining deficiencies.
(Ord. No. 92-157, 8-18-1992; Ord. No. 95-200, 9-19-1995; Ord. No. 96-214, 12-3-1996, eff. 1-3-1997; Ord. No. 97-167, 10-7-1997; Ord. No. 06-301, 12-19-2006, eff. 1-1-2007; Ord. No. 22-044, § 2, 5-3-2022)
Ask a question about Naperville law
Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.