§ 9-1B-24 — COORDINATION OF CONSTRUCTION ACTIVITIES:
Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 9-1B-24
Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/6739f5ff-35aa-4d3b-a54c-6aa8bf556e59
9-1B-24: - COORDINATION OF CONSTRUCTION ACTIVITIES:
All grantees are required to cooperate with the City and each other. To the maximum extent possible and as permitted by law, a grantee shall design and schedule its work so as to coordinate with other persons installing, constructing, or maintaining facilities in the public right-of-way. 1. By February 1 of each year, each license or franchise grantee shall provide the City with an updated map or maps certifying the location of all facilities within the public streets and ways, including such mapping system information in the City's electronic format. Such map shall show, but not be limited to showing, the number, size, and locations of antennas, pipelines, conduits, cables, vaults, pedestals, fiber optic and all other associated facilities located within the public street and ways. 1.1. If a grantee's facilities map or maps have not changed from the map or maps submitted in a previous year, in lieu of submitting a new map or maps, a grantee may, at its election, provide an affidavit to the City certifying that the previous year's map has not changed. The certification shall also include the date that the previous map was submitted to the City. 2. By February 1 of each year, or the first regular business day thereafter, each grantee shall file an annual construction plan with the City showing all work within the public streets and ways that it anticipates it will begin the next one (1) year that will include installation, relocation, or removal of a facility exceeding the lesser of one (1) City block or four hundred (400) feet in length. 2.1. If a grantee does not propose such work in the next one (1) year, the grantee shall submit a plan with a statement that the grantee anticipates no such work but thereafter shall report any such work to the City as soon as it becomes reasonably foreseeable. The plan shall be in a format the City deems necessary to facilitate the coordination within the public streets and ways. 2.2. Each grantee shall file with the City any amendments to information contained in the annual construction plan no more than thirty (30) calendar days after approving the change necessitating the amendment. 3. The City may disclose information in a grantee's master excavation plan to any public or private entity planning on conducting excavation activities in the public streets or ways only on a need-to-know basis in order to facilitate coordination among grantees and to avoid unnecessary excavation in the public streets and ways. To the maximum extent permissible under the Illinois Freedom of Information Act (5 ILCS 140), as amended, the City shall not otherwise disclose the public any information contained in a construction plan submitted by grantee that is proprietary, trade secret, or is otherwise protected from disclosure; provided, however that the City shall have no duty to decline to disclosure any information that grantee has not identified on its face as proprietary, trade secret or otherwise protected from disclosure. 4. Each grantee shall meet with the City, other grantees and users of the public streets and ways annually or as determined by the City to schedule and coordinate construction in the public streets and ways. 5. All construction locations, activities and schedules shall be coordinated, as ordered by the Director, to maximize cost savings and efficiencies, and minimize public inconvenience, disruption or damages. 6. Each grantee shall adjust to depth, line, and/or grade at its sole expense all appurtenances related to their communications facilities in the street or public way at the time the street or public way rehabilitation, repair or reconstruction occurs. 7. Each license or franchise grantee may be required when installing, constructing, or maintaining facilities in the public right-of-way, except for small wireless facilities, in the sole discretion of the Director, to also install conduit, inner duct, and fiber optic cable ("underground communications infrastructure") on behalf of the City. A grantee is required to obtain confirmation in writing from the City about whether the City requires the installation of underground communications infrastructure for areas located within the grantee's proposed construction plan. 7.1. In addition, to the installation of underground communications infrastructure, the grantee may be required, in the sole discretion of the Director, to install such vaults, manholes, hand-holes, and other appurtenances and facilities as are necessary or needed to accommodate installation and connection of underground communications infrastructure. 7.2. All construction and installation required in this Section shall be accomplished by the construction standards set forth in this Chapter. 7.3. All underground communications infrastructure installed by grantees shall be conveyed and dedicated to the City either with or as part of the dedication of the public street and/or right-of-way to the City. 7.4. The City will bear a pro rata share of the materials costs associated solely with underground communications infrastructure that is installed for the City's use and management. 7.5. All grantees shall be required to use available dark fiber (currently unused fiber optic strands) within then existing infrastructure or to locate their cable, wire, or lines within such available existing conduit unless it can be demonstrated to the reasonable satisfaction of the Director that such use or location is not technologically feasible or reasonably practicable. Fiber optic cable and strands as well as conduit shall be allocated to the grantees on a first-come, first-served basis; provided, that the City may reserve capacity within such fiber and conduits for its own use; and provided further, that the Director may reasonably adopt additional rules for fiber optic cable or strand and conduit allocation in order to ensure that all grantees have reasonable access to the City's rights-of-way and that no barrier to entry or competition result from the allocation of cable, strand, or conduit space. 7.6. The City reserves the right to charge reasonable fees for the use of fiber optic cable and fiber optic network conduit and attendant accessories, facilities, and infrastructure installed pursuant to this Section, to the extent consistent with and as limited by Federal and State laws and resolutions. 8. Except in an emergency or in the case of a new service connections to a new constructed or substantially remodeled building, there shall be no excavation in public streets and ways completely resurfaced or reconstructed by the City within the preceding three (3) years.
(Ord. No. 18-034, § 2, 4-3-2018; Ord. No. 18-066, § 6, 6-19-2018)
Ask a question about Naperville law
Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
