§ 9-1H-3 — SIDEWALK CONSTRUCTION, REPLACEMENT AND REPAIR:
Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 9-1H-3
Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/f1a4ba52-1768-4904-aa13-2690bafd3037
9-1H-3: - SIDEWALK CONSTRUCTION, REPLACEMENT AND REPAIR:
1. License And Permit Required: No person shall construct, install or repair any sidewalk within the City limits unless such person has first obtained: 1.1. A sidewalk contractor's license as required by the provisions of this Article; and 1.2. A permit from the Director for such construction, installation or repair, in accordance with the provisions of this Article. 2. Construction Authorized: The City Manager is hereby authorized and made responsible for causing the construction, replacement or repair of sidewalks as provided hereinafter: 2.1. The City Council, upon recommendation of the Director, or the City Manager, shall declare existing sidewalks or public ways to be substandard if the Council finds that: 2.1.1. Sidewalk construction and installation is necessary for the protection and safety of pedestrians on all arterial streets, as shown on the City's thoroughfare plan, and any other streets identified as a pedestrian collector; or 2.1.2. Sidewalks are broken, have sections of different height, have excessive grade, or have other defects, such that walking on the sidewalks presents danger under normal weather conditions; or 2.1.3. Sidewalks, constructed after passage and approval of the standard specifications for the construction of sidewalks, do not conform to such standard specifications; or 2.1.4. Sidewalks have not been constructed and installed where the same are necessary to join existing sections of sidewalks. 2.1.5. Sidewalk construction or replacement is necessary to make the public way conform to sidewalk specifications adopted for an area of special concern in accordance with Subsection 9-1H-7.4 of this Article. 2.2. Following a determination by the City Council that sidewalk construction, replacement or repair is required in accordance with the above, it shall adopt an ordinance providing for said work to be done and financed as provided by the requirements of this Article. 3. Safe School Walk Routes: As proposed in the annual sidewalk program, new sidewalk installations on safe school walk routes in established neighborhoods will be installed at one hundred percent (100%) City cost. 4. Petition For Improvement: Upon petition by more than fifty percent (50%) of those persons owning property abutting any single system of improvement, the City Council may, with the advice of the Director regarding economic and engineering feasibility, initiate sidewalk construction in that City block and the financing of such construction shall be in accordance with applicable statutes. 5. Requirement In Construction With Building And Occupancy Permit: 5.1. Before a building permit is issued for structures including mobile homes and/or temporary structures served by permanent water and sewer connections on a lot or tract having no abutting sidewalks, the owner of such lot or tract shall agree to install sidewalks on the side of all dedicated rights-of-way abutting such lot or tract, not including, for corner lots, sidewalk extensions up to the curb line at the nearest roadway intersection. The foregoing provisions shall not apply when the Director finds that: 5.1.1. It would be unreasonable to construct sidewalks because of the costs involved, taking into consideration the following factors: cost of engineering, cost of construction, need for sidewalks, and the topographic condition of the terrain where the sidewalks would be constructed; or 5.1.2. The construction of new sidewalks would not be required by the subdivision control regulations of the City [9]; 5.2. Any applicant who is refused a building or occupancy permit for failing to comply with the provisions of this Article may, in writing, appeal the finding of the Director under Subsection 9-1H-3.5.1.1 or 9-1H-3.5.1.2 of this Section, to the City Council, provided such appeal is made within twenty-one (21) days and is in writing. 5.3. No occupancy permit shall be issued permitting use of the structure for which a building permit was issued pursuant to the above requirement, unless and until the sidewalk work agreed to has been completed; provided, that in the instances of a certificate of occupancy for such building construction by reason of the season of the year, or for other reasons making it impractical to build such sidewalk in a workmanlike manner at such time, the construction of such sidewalk may be postponed to a future date agreed upon between the owner of such premises and the Director, said agreement to be in writing and the breach of same enforceable as a violation of this Section, in addition to other remedies which may, by law, be provided. Furthermore, security in an amount and form acceptable to the City Attorney shall be given to the City to ensure such future construction.
(Ord. 74-13, 3-25-1974; amd. Ord. 97-158, 10-7-1997) (Ord. 74-56, 7-29-1974; amd. Ord. 97-158, 10-7-1997) (Ord. 92-72, 5-5-1992; amd. Ord. 97-158, 10-7-1997) (Ord. 04-30, 3-2-2004)
Ask a question about Naperville law
Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.