For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Chapter 27 — Electrical

Baltimore City Code (current through Ord. 26-129 (July 17, 2026); publication of Oct. 18, 2026), Baltimore, MD · 8 sections. Independent public-information project, not the official City of Baltimore website.

  1. § 2701 — General
  2. § 2702 — Emergency and Standby Power Systems
  3. § 2703 — Permit and Certificate of Inspection
  4. § 2704 — Inspections
  5. § 2705 — Unsafe Existing Installations
  6. § 2706 — Permits
  7. § 2707 — Licensing Requirements
  8. intro — Introductory text