VIII — CONTROL AND PROTECTION OF SUPPLY
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026), Minneapolis, MN · 6 sections. Independent public-information project, not the official City of Minneapolis website.
- § 509.1300 — Control and protection of supply is required
- § 509.1310 — Inspection of supply
- § 509.1320 — Connection to another water system
- § 509.1330 — Separation from connected system
- § 509.1340 — Cross-connections and backflow prevention in potable water system
- § 509.1350 — Compliance with plumbing code
