Chapter 23.42 — UNDERGROUND DISTRICT

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025), St. Louis, MO · 26 sections. Independent public-information project, not the official City of St. Louis website.

  1. § 23.42.010 — District described
  2. § 23.42.020 — Certain apparatus may remain overhead
  3. § 23.42.030 — Penalty for placing wires above surface
  4. § 23.42.040 — Wires shall be an obstruction—Exception
  5. § 23.42.050 — Penalty for failure to put wires underground
  6. § 23.42.060 — Removal of poles and fixtures
  7. § 23.42.070 — Permit required
  8. § 23.42.080 — Board of Public Service
  9. § 23.42.090 — Excluded persons
  10. § 23.42.100 — Bond
  11. § 23.42.110 — Transmission of electricity for communication
  12. § 23.42.120 — Penalty for no permit
  13. § 23.42.130 — City purchase of conduits
  14. § 23.42.140 — Conduit—Maintenance
  15. § 23.42.150 — Conduit—Construction—Changes
  16. § 23.42.160 — Street repair
  17. § 23.42.170 — Common trench
  18. § 23.42.180 — Time limit
  19. § 23.42.190 — Applicability of Sections 23.42.010—23.42.230 to certain corporations
  20. § 23.42.200 — Acceptance of Sections 23.42.010—23.42.230 required
  21. § 23.42.210 — Termination of rights
  22. § 23.42.220 — Prices for services
  23. § 23.42.230 — Leasing or subletting conduit space
  24. § 23.42.240 — Overhead wire removal—Required
  25. § 23.42.250 — Overhead wire removal—Yearly amount
  26. § 23.42.260 — Overhead wire removal—Board of Public Service orders