For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.29B.060 — System performance

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 8.29B.060

Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/a3be0ae2-187e-48dc-84cb-a7947bbd0421

8.29B.060 - System performance.

As a condition to its right to exercise its franchise and its rights thereunder, the grantee covenants as follows: A. The grantee will design, install and operate its cable television system so that the cable system is at all times: 1. Capable of continuous twenty-four (24) hour daily operation; 2. Capable of operating over an outdoor temperature range of -20 degrees F to 120 degrees F without catastrophic failure or irreversible performance changes over variation in supply voltage from 105 to 130 volts AC; 3. Capable of meeting all specifications as set forth herein over an outdoor temperature range of 0 degrees F to 100 degrees F over variations in supply voltages from 105 to 130 volts AC; 4. Operated in such a manner as to avoid causing unlawful interference with reception of off-the-air signals by non-subscribers; 5. In full compliance with the technical standards of the Federal Communications Commission. B. Performance Monitoring. 1. Test procedures used in verification of the performance criteria set forth herein shall comply with all applicable Federal Communications Commission ("FCC") rules and regulations. 2. The results of such tests shall be filed with the franchise agency within thirty days after completion of each test. Each such filing shall specify the procedures used and shall explain in detail any instances of noncompliance, their actual or likely scope or causes, and grantee's recommendation of the best measures to correct the noncompliance. 3. If complaints received or other evidence indicate an unresolved controversy or significant noncompliance with any applicable technical standards, the agency may require additional tests, full or partial repeat tests, or tests involving a specific subscriber's terminal. Such tests will be limited to the particular matter in controversy. The agency will endeavor to arrange its requests for special tests so as to minimize hardship or inconvenience to grantee or to its subscribers. 4. The grantee shall notify the agency in advance of tests for compliance with FCC standards. The agency may have representatives present to observe such tests. 5. The results of annual performance tests in accordance with FCC rules and regulations shall be retained by the grantee for at least five (5) years and shall be available for inspection by the franchise agency during business hours at grantee offices in the City upon twenty-four hours' notice. Copies of such test results shall be promptly provided upon the agency's request. 6. Grantee shall conduct monthly tests of the emergency alert system, in conjunction with the City department designated for such testing. 7. Grantee and the City shall conduct system performance tests pursuant to Exhibit 4, which is codified in this chapter.

(1994 C., § 8.29B.060; Ord. No. 65433, § 6, 2001.)

Ask a question about St. Louis law

Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.