For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.29A.070 — Installations and reconnections

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 8.29A.070

Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/9ce98069-a217-4153-b018-464c1a68d468

8.29A.070 - Installations and reconnections.

A. Under normal operating conditions, installations must be completed within seven (7) business days after an order is placed, unless the subscriber asks for a later date. The operator may require advance payment of the installation fee and the first month's service charges. Installations which require more than one hundred twenty-five (125) feet of drop cable from the tap, or which would occur in buildings not wired for cable service, may take longer than seven (7) business days. In such cases, the operator shall provide the subscriber and/or the agency with a written explanation and a proposed schedule for installation, but it shall be completed within sixty (60) days in any case. B. Subsection A of this section shall not apply if the service or product requested by the subscriber is not generally available from the operator in the subscriber's area (for example, if an upgrade necessary to provide the service has not yet been completed in that area). C. Reconnections due to erroneous disconnections based on the operator's billing or technical errors must be completed at no charge the same day as the subscriber notifies the operator of the disconnection to the extent reasonably possible, but in any event within twenty-four (24) hours. The subscriber must be provided a credit for time out of service. D. Reconnections after a disconnection attributed to non-payment of bills must be completed within seven (7) business days after payment has been received by the operator. In such instances only, operator may require that payment by check has cleared subscriber's bank before the payment is deemed received by the operator. E. Installations shall not be considered completed, nor may a subscriber be billed for services, until all services and equipment the subscriber is told would be installed as part of that installation are in full working order. F. A building owner's preference as to the point of entry into a building shall be observed whenever feasible. Runs in building interiors shall be as unobtrusive as possible and outlets located for the convenience of the subscriber. The operator shall use due care in the process of installation and shall repair or restore any damage to the subscriber's property caused by said installation work. Such repair or restoration shall be undertaken as soon as possible after the damage is incurred, shall be subject to reasonable subscriber approval of the corrective action and shall be completed within no more than thirty (30) days after the damage is incurred, unless this is not reasonably possible, in which case it shall be completed as soon as possible. Should such repair or restoration not be completed within the thirty-day period, the operator shall notify the franchise agency and the franchise agency shall have authority to review disputes between an operator and subscribers as to such damage and to require reasonable corrective action by an operator. G. The provisions of Section 8.29A.060 regarding appointments shall apply, without limitation, to appointments for installations.

(1994 C., § 8.29A.070; Ord. No. 65430, § 7, 2001.)

Ask a question about St. Louis law

Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.