Chapter 55 — IRRIGATION SYSTEMS
Code of Ordinances of the City of Edinburg, Texas (Codified through Ordinance No. 2026-5214, enacted June 2, 2026 (Supp. No. 14)), Edinburg, TX · 16 sections. Independent public-information project, not the official City of Edinburg website.
- § 55.01 — Definitions
- § 55.02 — Valid license required
- § 55.03 — Permit required
- § 55.04 — Backflow prevention methods and devices
- § 55.05 — Specific conditions and cross-connection control
- § 55.06 — Water conservation
- § 55.07 — Irrigation plan design: minimum standards
- § 55.08 — Design and installation: minimum requirements
- § 55.09 — Completion of irrigation system installation
- § 55.10 — Maintenance, alteration, repair, or service of irrigation systems
- § 55.11 — Reclaimed water
- § 55.12 — Advertisement requirements
- § 55.13 — Duties and responsibilities of city irrigation inspectors
- § 55.14 — Items not covered by this chapter
- § 55.15 — Fees
- § 55.99 — Penalty
