§ 17F.020.020 — Construction
Spokane Municipal Code; partial · SMC 17F.020.020 · Effective
Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/2b4fe2f5-3309-4fe1-8959-5e20c9c3e482
Section 17F.020.020 Construction
A. Mixed Construction. Buildings complying with this chapter may be designed and constructed where the basement and first story or the first and second story without a basement is constructed of Type I construction, and the top stories of Type VA construction. The Type I construction shall be separated from the Type VA construction above with a three-hour occupancy separation along the full interface of the two construction types including overhangs and balconies. B. Construction Types. Type I and Type VA construction shall be as specified in chapter 6 of the International Building Code (IBC).
Date Passed: Monday, August 14, 2006 Effective Date: Wednesday, September 27, 2006 ORD C33901 Section 6
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.
