For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.08D.150 — Stormwater program requirements

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.08D.150

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/21204704-66b3-42c6-976d-cbc531d3cf9f

§ 12.08D.150: Stormwater program requirements.

A. Pursuant to the terms of the municipal stormwater permit, the City has implemented a stormwater management program that includes the use of its SWMM, and regulations and administrative procedures, which are administered by the control authority. B. The following activities are regulated through the stormwater management program under this chapter: 1. Direct and indirect discharges to the municipal stormwater system or receiving waters within the City, including discharges related to stormwater maintenance activities. C. Minimum source control requirements for existing discharges. Source control BMPs shall be implemented by all property owners, residents, businesses, and public entities engaged in pollution generating activities. 1. If the control authority determines that discharges from a property or right-of-way cause or contribute to an illicit discharge, a nuisance, a threat to public health and safety, or a violation of the municipal stormwater permit or this chapter, the control authority shall require the responsible person to implement and maintain BMPs in accordance with the SWMM. Structural source control BMPs, or treatment BMPs/facilities, or both, shall be required if operational source control BMPs do not prevent illicit discharges or violations of surface water, groundwater, or sediment management standards because of inadequate stormwater controls. BMPs shall be designed, operated, and maintained in accordance with the SWMM. 2. The control authority shall also require persons responsible for track-out conditions on streets or alleys to implement and maintain operational BMPs in accordance with the SWMM to prevent polluted matter from entering the municipal stormwater system. 3. Source control activities and BMPs shall be implemented to the extent necessary to prevent prohibited discharges and to prevent contaminants from coming in contact with stormwater. Source control activities and BMPs include, but are not limited to, segregating or isolating wastes to prevent contact with stormwater; enclosing, covering, or containing the activity to prevent contact with stormwater; developing and implementing inspection and maintenance programs; sweeping; and taking management actions, such as training employees on pollution prevention. Source control can also include structural source control BMPs, or treatment BMPs/facilities, or both. 4. Spill prevention BMPs shall be required for all businesses and public entities engaged in pollution generating activities and as otherwise required by the control authority. Minimum requirements for spill prevention shall include developing and implementing plans and procedures to prevent spills and other accidental releases of materials that may contaminate stormwater or receiving waters. This requirement may be satisfied either by implementation of a SWPPP prepared in compliance with an NPDES stormwater permit for the site; or implementation of procedures for immediate containment and other appropriate action regarding spills and other accidental releases to prevent contamination of stormwater; and providing necessary containment and response equipment on-site. Personnel shall be trained regarding procedures and equipment to be used for spill prevention and cleanup. D. Minimum requirements for new development and redevelopment. New development and redevelopment activities that meet or exceed the thresholds outlined in the SWMM shall comply with the minimum requirements contained in the SWMM. E. Exemptions. Except as otherwise provided herein, development undertaken by the Washington State Department of Transportation in state highway rights-of-way that it owns or controls by long-term lease or easement, or for which it has maintenance responsibility, if undertaken in compliance with a WSDOT NPDES Permit, is exempt from the requirements of TMC § 12.08D.150D. Provided, however, that where a provision of TMC § 12.08D.150D is more stringent than a corresponding provision in the WSDOT NPDES Permit, the provision of TMC § 12.08D.150D shall apply. The Washington State Department of Transportation shall submit copies of plans for these exempt development activities within the aforementioned rights-of-way to the control authority prior to commencing such activities. F. Stormwater maintenance activities. Proper maintenance of all municipal stormwater systems and all private stormwater systems shall be required in accordance with the SWMM or other control authority approved standards. 1. Maintenance and inspection. All private stormwater systems shall be maintained by the owner, or the homeowner and/or homeowner association or similar organization, if one is established as part of a residential or commercial development. All private stormwater systems shall be regularly inspected by the owner or other responsible person to ensure proper operation and monitored as required or as set forth in the SWMM or O&M manual approved by the control authority. The owner, or homeowner and/or owner association or other responsible person, shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person completing the action, the date said action was taken, how the action was completed, results of any monitoring efforts, and any problems encountered or follow-up actions required. The records shall be made available to the control authority upon request. The owner, or homeowner and/or owner association, or other responsible person shall maintain a copy of the O&M manual on site, and shall make reference to such document in real property records filed with the Pierce County Auditor, so others who acquire real property served by the private stormwater systems or controls are notified of their obligation to maintain such private stormwater systems. 2. Control authority inspection and maintenance. The control authority is authorized to inspect all private stormwater systems in accordance with TMC § 12.08D.300 to ensure they are properly operating and are being properly maintained. If the stormwater system is not properly maintained, the control authority may notify the owner(s) that maintenance is required. If the owner(s) fails to maintain the stormwater system, the control authority may, with written notice to and permission of the owner(s), maintain the stormwater system and bill all associated costs to the owner as supplemental charges. In the event that emergency maintenance is needed to protect human health, property, or improvements and a reasonable attempt to contact the owner(s) is impracticable under the circumstances due to the potential for imminent harm or danger to persons or property, or such attempt at notice has failed, the control authority may exercise its legal rights and authority to protect health and property. 3. Pest control for stormwater BMPs/facilities. Use of pesticides, including herbicides, fungicides, and molluscicides in or adjacent to stormwater BMPs/facilities shall only be approved if applied in accordance with the specific operations and maintenance plan approved by the control authority for the BMP/facility, EPA’s guidance on integrated pest management and other applicable BMPs. The least invasive method of pest control shall be employed, which may include pesticide use if it is infeasible to use other control methods. Pesticide use shall be in accordance with the federal and state laws and regulations, including, but not limited to the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 U.S.C. §136 et seq.) and specific restrictions or permitting required by the EPA, Department of Ecology and State Department of Agriculture. All pesticide application shall be applied only by or under the direct supervision of specially trained and certified Pesticide Applicators or Aquatic Pesticide Applicators. 4. Persons required to construct a stormwater BMP/facility pursuant to older or replaced site development or stormwater regulations, which is covered by a maintenance or defect financial guarantee or which has been released from all required financial guarantees prior to the effective date of this section, and all persons holding title to the property for which a facility was required shall be responsible for the continual operation and maintenance of the facility in accordance with standards and requirements that were the basis of approval of the site development permit and for any liability as a result of breach of these duties.

( Ord. 28761 Ex. D, 2021-05-25 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.