§ 12.08C.250: Flow equalization.
The Control Authority may require any industrial user discharging to the POTW to install and maintain, on its property and at its expense, a suitable storage and flow control facility to ensure equalization of flow. An industrial wastewater discharge permit may be issued solely for flow equalization.
( Ord. 28761 Ex. C, 2021-05-25 )