14.18.045 - West Henderson 2630/2760 PZ water backbone infrastructure rates.
A. Planning and design of water backbone infrastructure for the West Henderson 2630 Pressure Zone and the West Henderson 2760 Pressure Zone, construction of that infrastructure, and financing of that construction are required to support water service to existing and future developments in the West Henderson area. The director has the right to determine the size and capacity of the water backbone infrastructure, timing of construction of the water backbone infrastructure, and method of financing the construction, taking into account projected service needs of the West Henderson area served and the need for the orderly and efficient development of the city's public infrastructure system. The West Henderson 2630 Pressure Zone ("2630 PZ") and the West Henderson 2760 Pressure Zone ("2760 PZ") are located in West Henderson. A depiction of the 2630 PZ and the 2760 PZ is available on the city's website.
B. Through December 31, 2022, the rate charged to projects that the city determines will receive a benefit from the water backbone infrastructure planned, designed, constructed, and/or financed for (1) a portion of the 2630 PZ is referred to as the "phase 1A 2630 PZ water infrastructure rate" and (2) a portion of the 2760 PZ is referred to as the "phase 1A 2760 PZ water infrastructure rate." These rates are addressed in this section 14.18.045. The amount charged for the phase 1A 2630 PZ water infrastructure rate and phase 1A 2760 PZ water infrastructure rate (collectively, "phase 1A 2630/2760 PZ rates") shall be in addition to system development, regional connection, and other applicable charges for water service.
C. Effective January 1, 2023, the rate charged to projects that the city determines will receive a benefit from the water backbone infrastructure planned, designed, constructed, and/or financed for (1) a portion of the 2630 PZ is referred to as the "WH 2630 PZ water infrastructure rate" and (2) a portion of the 2760 PZ is referred to as the "WH 2760 PZ water infrastructure rate." These rates are addressed in this section 14.18.045. The amount charged for the WH 2630 PZ water infrastructure rate and WH 2760 PZ water infrastructure rate (collectively, "WH 2630/2760 PZ rates") shall be in addition to system development, regional connection, and other applicable charges for water service.
D. Effective January 1, 2023, all new projects that the city determines will receive a benefit from existing or future water backbone infrastructure planned, designed, constructed, and/or financed for the 2630 PZ or for the 2760 PZ shall be charged and pay the WH 2630 PZ water infrastructure rate and/or the WH 2760 PZ water infrastructure rate, as the city determines is appropriate. The amount(s) charged shall be based upon the total EDUs proposed for the project, as reflected in the civil improvement plans for the project approved by the city, and the rate(s) used will be the one(s) in effect on the date the city processes the building permit for the project or, if a project is not required to obtain a building permit from the city, at the rate in effect on the date the city approves the civil improvement plans for the project.
E. Any project that was initiated at the city before January 1, 2023, and either was required to pay the rate(s) established (or other amount charged by the city) for existing or future water backbone infrastructure planned, designed, constructed, and/or financed for the 2630 PZ or for the 2760 PZ or whose approval was conditioned on the city being paid such rate(s) shall be charged and pay, as the city determines is appropriate, (1) if the building permit is issued prior to January 1, 2023, the phase 1A 2630 PZ water infrastructure rate and/or the phase 1A 2760 PZ water infrastructure rate or (2) if the building permit is issued on or after January 1, 2023, the WH 2630 PZ water infrastructure rate and/or the WH 2760 PZ water infrastructure rate. The amount(s) charged shall be based upon the total EDUs proposed for the project, as reflected in the civil improvement plans for the project approved by the city, and the rate(s) used will be the one(s) in effect on the date the city processes the building permit for the project or, if a project is not required to obtain a building permit from the city, at the rate in effect on the date the city approves the civil improvement plans for the project.
F. All projects that proceed with additional improvements to a property that result in an increase in water usage above the usage previously proposed - as reflected in the civil improvement plans approved by the city, in the building permit issued by the city, or by other means of receiving official city approval for such additional improvements (each, a "city approval") - and that the department determines will receive a benefit from existing or future water backbone infrastructure planned, designed, constructed, and/or financed for the 2630 PZ or for the 2760 PZ shall be charged and pay, as the department determines is appropriate, (1) if the city approval is issued prior to January 1, 2023, the phase 1A 2630 PZ water infrastructure rate, and/or phase 1A 2760 PZ water infrastructure rate and (2) if the city approval is issued on or after January 1, 2023, the WH 2630 PZ water infrastructure rate and/or the WH 2760 PZ water infrastructure rate. Whether there is an increase in water usage shall be determined by the director in their sole discretion. The rate(s) charged shall be based upon the increase in total additional EDUs associated with the property improvements and at the rate in effect on the date the city processes the building permit for the proposed improvements or, if a project is not required to obtain a building permit from the city, at the rate in effect on the date the city approves the civil improvement plans for the proposed improvements or provides its approval of the additional improvements by other means.
G. As provided for in this title, equivalent dwelling unit (EDU) is defined as "a measure of water demand equivalent to the amount of water used annually by an average single-family residential dwelling unit. One EDU is equivalent to 0.55 acre-feet of water per year." For the purpose of calculating the total EDUs attributable to each project being assessed a rate under this section 14.18.045, the EDU calculation table in subsection 14.18.045.L shall apply. However, where it is determined by the director that the "EDU Calculation Factor" or "EDU %" reflected in that table does not adequately reflect the water demands placed upon the city's water system by a proposed project, then the city shall not use that table and instead shall use an alternate method in order to determine the appropriate amount to charge that project for its equitable share of the water backbone infrastructure planned, designed, constructed, and/or financed for 2630/2760 PZ. Final determination of such alternate method shall be made by the director.
H. The phase 1A 2630 PZ water infrastructure rate shall be $3,067.00 per EDU, and the phase 1A 2760 PZ water infrastructure rate shall be $5,145.00 per EDU. The initial WH 2630 PZ water infrastructure rate shall be $3,527.00 per EDU, and the initial WH 2760 PZ water infrastructure rate shall be $5,660.00 per EDU. These rates are based upon actual and estimated costs for the city to fund the planning, design, construction, and/or financing of the water infrastructure for the 2630 PZ and the 2760 PZ. The city manager may adjust the WH 2630 PZ water infrastructure rate and/or the WH 2760 PZ water infrastructure rate once each calendar year by an amount that (1) for the WH 2630 PZ water infrastructure rate, is no more than 15 percent of the WH 2630 PZ water infrastructure rate in effect in the immediately preceding period; and (2) for the WH 2760 PZ water infrastructure rate, is no more than ten percent of the WH 2760 PZ water infrastructure rate in effect in the immediately preceding period. The city will identify the phase 1A 2630 PZ water infrastructure rate, the phase 1A 2760 PZ water infrastructure rate, the then-current WH 2630 PZ water infrastructure rate, and the then-current WH 2760 PZ water infrastructure rate in the department service rules. Unless otherwise approved in writing by the director in their sole discretion, the rate(s) assessed shall be paid to the city when the city issues a building permit, prior to issuance of a certificate of occupancy, or prior to commencement of temporary or permanent water service, whichever date is earliest.
I. For five years after a certificate of occupancy is issued for a project or an improvement is made to a project, the city has the right to audit that project to confirm that the project's average annual water usage is substantially the same as the total EDUs proposed for the project or project improvement. If the city determines the project is using more EDUs than proposed, the city may require the original developer of the project or project improvement, as applicable, to pay the difference between the total EDUs charged the project and total EDUs actually used at the property at the phase 1A 2630 PZ water infrastructure rate, phase 1A 2760 PZ water infrastructure rate, WH 2630 PZ water infrastructure rate, and/or WH 2760 PZ water infrastructure rate, as appropriate, in effect on the date the city prepares a bill for the additional payment.
J. If the phase 1A 2630 PZ water infrastructure rate, phase 1A 2760 PZ water infrastructure rate, WH 2630 PZ water infrastructure rate, or the WH 2760 PZ water infrastructure rate is adjusted after the city receives a payment, the city is not obligated to true-up the payment received or to refund/collect any difference.
K. If a customer requests to design, construct, and pay for all or a portion of the WH water backbone water infrastructure for the 2630 PZ and/or for the 2760 PZ, the city may enter into a special refunding agreement acceptable to the city and in accordance with applicable provisions in section 14.16.050 that provides for repayment of a portion of those costs from WH rates collected, or to be collected, by the city from customers that will receive a benefit from existing or future water backbone infrastructure planned, designed, constructed, and/or financed for the 2630 PZ or for the 2760 PZ.
L. EDU Calculation Table.
Type of Development | EDU Calculation Factor
Low Density Single-Family: RS-4, RS-6, RS-8, and RMH | 1.0 EDU/lot
Medium-Density Residential: RM-10 and RM16 | 0.81 EDU/unit
Medium-Density Residential and High-Density Multifamily Residential: RH-24 and RH-36 | 0.51 EDU/unit
Commercial and Industrial (1) | See Commercial and Industrial Meter Equivalency Chart (Potable Water) (2)
(1) Commercial and Industrial includes all non-residential, mixed-use, and special-purpose districts, including, but not limited to, schools, churches, public facilities, recreational vehicle parks, convalescent/assisted living facilities, etc.
(2) The EDU calculation factor shall be based on meter size as reflected in the Commercial and Industrial Meter Equivalency Chart (Potable Water).
Commercial and Industrial Meter Equivalency Chart
(Potable Water)
Applicable Through 12/31/2022
Meter Size (inch) (a) | EDU | phase 1A 2630 PZ (per meter) (b) | phase 1A 2760 PZ (per meter) (b)
¾" | 1.00 | $3,067 | $5,145
1" | 1.67 | $5,121 | $8,593
1½" | 3.33 | $10,212 | $17,134
2" | 5.33 | $16,345 | $27,425
3" | 11.67 | $35,787 | $60,047
4" | 21.00 | $64,398 | $108,054
6" | 46.67 | $143,118 | $240,138
8" | 80.00 | $245,327 | $411,636
10" | 126.67 | $388,445 | $651,774
12" | 166.67 | $511,108 | $857,592
(a) When a combination fire and domestic system is utilized, the charges shall be based on the size of the meter that would be required to accommodate all non-fire flow demands. Said meter sizing shall be based on the American Water Works Association standards for sizing meters or other nationally recognized method as approved by the director. (b) Based upon the phase 1A 2630 PZ water infrastructure rate of $3,067 per EDU, and phase 1A 2760 PZ water infrastructure rate of $5,145 per EDU.
Commercial and Industrial Meter Equivalency Chart
(Potable Water)
Applicable On and After 1/1/2023
Meter Size (inch) (a) | EDU | 2630 PZ 2023 Charge (per meter) (b) | 2760 PZ 2023 Charge (per meter) (b)
¾" | 1.00 | $3,527 | $5,660
1" | 1.97 | $6,948 | $11,150
1½" | 3.94 | $13,897 | $22,300
2" | 13.20 | $46,556 | $74,712
3" | 48.85 | $172,294 | $276,491
4" | 72.51 | $255,743 | $410,407
6" | BASED UPON ANNUAL WATER USE | SEE NOTE (2) BELOW | SEE NOTE (2) BELOW
8"
10"
12"
(a) When a combination fire and domestic system is utilized, the charges shall be based on the size of the meter that would be required to accommodate all non-fire flow demands. Said meter sizing shall be based on the American Water Works Association standards for sizing meters or other nationally recognized method as approved by the director. (b) Based upon the 2630 PZ water infrastructure rate of $3,527 per EDU and 2760 PZ water infrastructure rate of $5,660 per EDU.
Notes: (1) Commercial and Industrial includes all non-residential, mixed-use, and special-purpose districts, including, but not limited to, schools, churches, public facilities, recreational vehicle parks, convalescent/assisted living facilities, etc. (2) EDU calculation factor for Commercial and Industrial that installs a meter greater than or equal to a 6" meter shall be based upon the total estimated annual water usage for the project, in gallons per year, based upon the formula of 1 EDU = 0.55 acre-feet per year. See example below Example: Project A Annual water use = 50,000,000 gallons 1 EDU = 0.55 acre-feet per year = 325,851 x 0.55 = 179,218 gallons per year Total EDUs = (50,000,000 gallons) x (1 EDU/179,218 gallons per year) = 279.0 EDUs
(Ord. No. 3912, § 3, 10-18-2022)