ARTICLE IV. - PROCEDURE.

A. GENERAL PROCEDURE. 1. Whenever any subdivision of land is proposed, before any recording of plats, and before any construction may begin on the land, the Subdivider shall apply for and secure approval of such proposed subdivision in accordance with the following procedure: a. Sketch Plat. b. Preliminary Plat. c. Construction Plans. d. Notice to Proceed. e. Initial Acceptance. f. Final Acceptance. 2. No plat or replat subdividing land into lots or modifying easements or right-of-way shall be filed or recorded until approved by the MBA. No lot shall be sold from such plat or replat until the plat is filed for record in the Office of the Chancery Clerk of Panola County, Mississippi located in Batesville, Mississippi. B. SUBDIVISION PROCEDURE. The Subdivider shall submit a Sketch, Preliminary, and Final Plat in accordance with the Subdivision Regulations. Upon approval of the Preliminary Plat by the Planning Commission, the Subdivider shall, as an agenda item at the regularly held MBA meetings, request approval of the Preliminary Plat and Development Contract from the MBA. Upon approval of the Preliminary Plat from the MBA, the Subdivider shall submit construction plans to the City for review. Upon approval of these plans by the City and fulfillment of all Administrative Requirements, a Notice to Proceed will be issued. Once construction is complete and all requirements of the Subdivision Regulations have been fulfilled, the Subdivider, as an agenda item at the regularly held MBA meeting, may request approval of the Final Plat from the MBA. C. SKETCH PLAT PROCEDURE. 1. The purpose of the Sketch Plat is to provide the Subdivider an opportunity to consult early and informally with City staff before submission of a formal application to the Planning Commission. The intent of this procedure is to assist the Subdivider in preparing a plan which will meet the objectives of the Comprehensive Plan, the requirements of the Planning Commission and of other public agencies, the necessary improvements and uses of the subdivision, and any other potential challenges involved in the proposed subdivision. 2. The Subdivider shall submit to the City a Sketch Plat showing the boundaries of the proposed subdivision, its relationship to surrounding properties, natural features and the proposed street and lot pattern. With the Sketch Plat, conceptual utility, grading and drainage, and site plans shall be submitted. This step does not require a filing fee. Upon review of the Sketch Plat, City staff shall notify the Subdivider through consultation and/or writing that the Sketch Plat as submitted meets or does not meet the objectives of these regulations and the reason therefore. City staff will also recommend any further revisions to the proposed project in order to meet the goals of the City. Comments provided by City staff are advisory in nature only and the project will be subject to review by the Planning Commission. 3. The submission of a Sketch Plat shall be the first day of the month that is not a Saturday, Sunday or City holiday in which City offices are closed. Comments will be provided to the Subdivider within two weeks of submission. D. PRELIMINARY PLAT APPLICATION PROCEDURE. 1. No items will be heard by the Planning Commission unless an item has been placed on the agenda. 2. Sixteen (16) paper copies and one (1) electronic copy of the Preliminary Plat Submittal conforming to the requirements of Article IV-E. DATE FOR PRELIMINARY PLAT shall be submitted to the City. The copies of the Preliminary Plat Submittal shall be accompanied by an application form and a filing fee as specified by the MBA. Complete applications for preliminary plat approval of Subdivision must be filed no later than the first day of the month that is not a Saturday, Sunday or City holiday in which City offices are closed in order to be on the agenda of the next regularly scheduled meeting of the Planning Commission. 3. If the Planning Commission, after the recommendation of the Engineer and City staff, finds that the preliminary plat satisfies the requirements of the Subdivision Regulations and conforms to the conditions of the Planning Commission, it may approve said Preliminary Plat. The Subdivider or authorized agent must be present at the Planning Commission meeting scheduled to hear the submitted application. 4. If the Planning Commission finds that the Preliminary Plat Submittal does not satisfy the requirements of the Subdivision Regulations or does not conform to the conditions of the Planning Commission, it shall specify the objections found to such submittal and may either disapprove the preliminary plat, approve the preliminary plat conditional upon specific changes being made to the preliminary plat submittal prior to its submission to the City for construction plan approval, or table the request for preliminary plat approval by the Subdivider in order for the plans to be revised or for more information to be provided for review and evaluation by the Engineer and the City. In a situation where request for preliminary plat approval is tabled, the applicant will have until the second Monday of the month to resubmit complete revised plans or other requested information to the City in order to be placed on the next regularly held Planning Commission meeting. A new application or associated fees is not required in association with a resubmission from an application being tabled. 5. The Planning Commission may attach additional conditions not specified in this ordinance or reject a subdivision if it has been determined that the proposed subdivision is not in keeping with the general character of the development in the area; and that in the best interest of the public, the site is not suitable for the proposed development. 6. The Subdivider may appeal the Planning Commission's decision to the MBA. A notice of appeal must be filed with the City within ten (10) calendar days after the Planning Commission's decision. Upon receipt of a notice of appeal, at date will be set for the appeal to be heard by the MBA. No requests for appeal will be made from the MBA without being on the MBA meeting agenda. 7. One (1) copy of the proposed plat and findings of the Planning Commission shall be given to the Subdivider, together with a certificate of approval or disapproval of the Planning Commission. This will be delivered by the United States Postal Service. Approval of the Preliminary Plat by the Planning Commission does not constitute a final acceptance or approval of the proposed subdivision. 8. Upon Preliminary Plat approval by the Planning Commission and upon request by the Subdivider, the project will be placed on the next regularly held MBA meeting for approval. The minutes from the Planning Commission meeting, the Development Contract, and the Preliminary Plat Submittal will be presented to the MBA for approval. 9. Preliminary Plat approval by the Planning Commission is valid for one (1) year. If the MBA has not approved the Preliminary Plat within one (1) year of the Planning Commission approving the Preliminary Plat, the Preliminary Plat approval will be invalidated by the City without further notice given to the Subdivider. Upon the invalidation of a Preliminary Plat, the Subdivider must resubmit to the Planning Commission for approval. 10. If a Notice to Proceed has not been issued by the Engineer within two (2) years from the date of the Preliminary Plat approval by the MBA, the Preliminary Plat approval will be invalidated by the City without further notice given to the Subdivider. Upon the invalidation of a Preliminary Plat, the Subdivider must resubmit to the Planning Commission for approval. E. DATA FOR PRELIMINARY PLAT SUBMITTAL. 1. The Preliminary Plat shall be submitted on 18 inch by 24 inch paper. All other construction plans shall be submitted on 24 inch by 36 inch paper. 2. Preliminary Plat shall be at an appropriate and legible scale. The Preliminary Plat and accompanying documents shall show at a minimum the following: a. The proposed lot lines, lot numbers, and lot layout complete with appropriate dimensions and acreage. b. Minimum building setback lines. c. The location and street names of all existing and proposed streets or alleys in the subdivision including dimensions of right-of-way. d. The location, width, and purpose of all easements. e. Sites reserved for parks, public spaces, and stormwater detention or retention. f. Areas which are subject to 100-year water surface elevations and FEMA Map reference. g. The proposed use of all land in the subdivision including any reserved areas and the acreage. h. The title under which the proposed subdivision is to be recorded, and the name and State of Mississippi registration number of the licensed professional engineer and/or registered land surveyor, and the name and contact information of the Subdivider. i. Location map showing relationship of the subdivision site to the area including township, range, section, and parts of sections. j. The names, boundaries, and zoning classifications of all adjoining subdivisions and the names of recorded owners of adjoining parcels of unsubdivided land. k. North arrow, graphic scale, and date. 3. The Site Plan shall show the following: a. The location of existing property lines, streets, buildings, water courses, utilities, and other existing features within the acreage to be subdivided and similar information regarding existing conditions of land immediately adjacent thereto. b. General proposed improvements. c. Items proposed for demolition or modification. d. The acreage of the land to be subdivided. e. Location map showing relationship of the subdivision site to the area including township, range, section, and parts of sections. f. The names, boundaries, and zoning classifications of all adjoining subdivisions and the names of recorded owners of adjoining parcels of unsubdivided land. g. North arrow, graphic scale, and date. 4. The Grading and Drainage Plan shall show the following: a. Existing topography (shown by contour lines at intervals of not greater than two feet) for the entire site and should extend a minimum of 100 feet beyond the property boundary. b. Proposed topography (shown by contour lines at intervals of not greater than two feet). c. Areas which are subject to water surface elevations at a 100-year storm event. d. The acreage with the drainage areas identified. e. Existing and proposed conceptual drainage structures. f. Flow entering and exiting the site. g. Existing utilities. h. North arrow, graphic scale, and date. 5. The Tree Protection/Landscape Plan: a. Existing topography (shown by contour lines at intervals of not greater than two feet) for the entire subject site and should extend a minimum of 100 feet beyond the property boundary. b. All trees ten inches (10") in diameter or greater indexed with species. The extent of tree identification and protection may be discussed at the Sketch Plat stage in the subdivision development process. Large tracts of land may not be required to identify all ten inches (10") in diameter or greater trees. c. Trees to be saved and trees to be removed. d. Tree protection fencing. e. Required landscaping and irrigation system. f. North arrow, graphic scale, and date. 6. The Utility Plan shall show the following: a. Existing and proposed utilities. b. Service connections. c. North arrow, graphic scale, and date. F. ADMINISTRATIVE REQUIREMENTS. 1. Development Contract. The Development Contract will be prepared by the City. Two (2) original copies will be provided to the Subdivider for execution. One (1) original executed contract is to be returned to the City. 2. Performance Bond. a. For the purpose of ensuring the prompt payment and performance of all of the Subdivider's obligations pursuant to the Subdivision Regulations, the developer shall provide a Performance Bond properly assigned to the City. b. The Performance Bond shall be conditional to secure the approval of construction of the required improvements listed in the Subdivision Regulations and as approved by the MBA in a satisfactory manner and within the specified time of construction. No such bond shall be accepted unless it is enforceable by or payable to the City in a sum at least equal to the amount specified below and in a form with surety and conditions approved by the Attorney. c. The Performance Bond amount shall be approved by the Engineer. The minimum bondable amount shall be two-thousand five-hundred dollars ($2,500) and shall be calculated by the following: 1. 50% of the cost of the water system improvements. 2. 25% of the cost for the sanitary sewer improvements. 3. 25% of the cost for the roadway and traffic/transportation improvements. 4. 25% of the cost of the stormwater drainage system improvements (excluding earthwork operations). 5. 50% of the cost of all other improvements, public or private, as required by this ordinance, the Planning Commission, or the MBA. d. Acceptable forms of bonds include a surety bond from a company licensed to do business in the State of Mississippi; cashier's check from banks located in the State of Mississippi, or irrevocable letters of credit from banks located in the State of Mississippi. e. The Performance Bond shall remain in force throughout the period of construction and the Warranty Period. The Performance Bond will not be released until Final Acceptance is granted. f. If the Subdivider fails to replace or repair construction or material failures or defects identified by the City within ninety (90) days of the date of written notice, payment to the City shall be made under the Performance Bond for the estimated costs, as determined by the Engineer, for the replacement or repairs of failures or for the actual costs after completion of the replacement or repairs. The City, at its discretion, will decide to receive payment before or after the repairs or replacement. All collection expenses, court costs, and attorney's fees incurred by the City in connection with collection under the Performance Bond shall be paid by the Subdivider and/or charged under the Performance Bond. g. In the event that a situation arises during construction associated with the project that is deemed an emergency by the City, the City may perform repairs or other construction in order to resolve the situation. The cost of the repairs or construction will be billed to the Subdivider and paid in full prior to the City granting Initial Acceptance. If the Subdivider refuses payment, payment to the City shall be made under the Performance Bond for the billable amount. h. All improvements will be guaranteed by the Subdivider after Initial Acceptance by the City, subject to normal wear and tear. The Performance Bond shall remain in effect for a minimum of one (1) year from the date of Initial Acceptance. The City may require extention of this time as the Engineer deems necessary. i. The Performance Bond will be released by the City when the Subdivider completes all requirements of the Subdivision Regulations and Final Acceptance is granted. 3. Insurance. a. General liability insurance in a minimum amount of $500,000 is required. The City may require more than the minimum amount as determined necessary by the City due to the nature of the project. b. A general contractor as designated by the Subdivider, may carry this insurance as a substitute for the Subdivider. The Subdivider must provide a letter designating the authorized general contractor. c. A certificate of insurance must be submitted to the City for review and approval by the Attorney. d. The certificate of insurance shall remain in effect throughout the period of construction, the Warranty Period, and until Final Acceptance is granted. 4. Licensed Contractors. a. All contractors performing work in association with a Subdivision shall have the appropriate license issued by the State of Mississippi. b. A listing of all contractors to perform work in association with a Subdivision shall be listed along with proof of licensure submitted to the City. 5. Federal, State, or Local Permits. All permits required from other agencies shall be obtained and copies provided to the City. G. CONSTRUCTION PLAN REVIEW PROCEDURE. 1. Construction plans will not be reviewed until the Development Contract has been executed. 2. Construction Plan review. a. Three (3) complete sets of construction plans shall be submitted to the City signed and sealed by all applicable State of Mississippi licensed professionals. b. After the City and Engineer review the construction plans, redline markups of the construction plans and formal typed comments will be sent to the Subdivider. c. One (1) complete set of revised construction plans shall be submitted to the City for review and comment along with the redline markup plans. If comments remain or additional comments are generated, the same process specified above shall be followed. 3. Approval. Once all comments and red line markups are addressed to the satisfaction of the City, four (4) complete sets of construction plans shall be submitted to the City. These plans will be marked approved by the City and two (2) sets will be returned to the Subdivider. 4. Notice to Proceed. a. Construction may not occur until the issuance of this document. b. Once all administrative requirements and construction plans are approved, a Notice to Proceed will be issued specifying that construction of the Subdivision may begin. c. The date of issuance of the Notice to Proceed sets the start date for the time of construction. H. DATA FOR CONSTRUCTION PLAN SUBMITTAL. 1. Types of plans required, but not limited to, are: a. Title Sheet. b. Preliminary Plat. c. Site Plan. d. Grading and Drainage Plan. e. Utility Plan. f. Roadway Plan and Profile. g. Erosion Control Plan. h. Tree Protection Plan. i. Landscape Plan. j. Traffic Control Plan. k. Details. 2. See Subdivision Design Standards for additional information and requirements. I. CONSTRUCTION PERIOD. 1. Time of Construction. A subdivision is to be completed within two (2) years from the issuance of a Notice to Proceed. If a Subdivision has not received Initial Acceptance in two (2) years from the date of the issuance of the Notice to Proceed, the Subdivider shall report to the MBA the status of the project and the estimated time of completion. The City may complete the necessary elements of the project, construct remaining items within the project, or clean and repair the project site with payment as specified with the Performance Bond. 2. Care of Area During Construction. a. The Subdivider shall be responsible for cleaning up all material and debris subject to be scattered by the wind or water each day and prevent such material from scattering through a subdivision, to adjoining property, or into street right-of-way. The premises shall be kept in a clear and unlittered manner. b. All streets are to remain clear of mud, dirt, and debris during construction. Streets shall remain open to traffic at all times unless previously approved by the Engineer. Streets shall not be used for storing or staging of equipment or materials. 3. Erosion Prevention and Sediment Control. a. Construction activity shall be done in such a manner as to provide for the most effective erosion prevention and sediment control. All erosion prevention and sediment control practices shall conform to the requirements of the Environmental Protection Agency's (EPA) National Pollution Discharge Elimination System (NPDES) and the Mississippi Department of Environmental Quality (MDEQ) requirements. b. Enforcement. 1. In the event that erosion prevention and sediment control measures are not installed, maintained, or functional; the requirements of the Mississippi Department of Environmental Quality are not followed; sediment is found to be leaving the site; or the site is not found to be appropriately stabilized by the Engineer, a notice of violation will be issued. 2. The notice of violation will generally state the issues that are found out of compliance and specify the time in which they are to be corrected. 3. If the issues are not corrected in the time period specified to the satisfaction of the Engineer, Article X: PENALTY of these regulations shall be adhered to. 4. Revisions to Construction Plans. During the course of construction, on-site conditions may differ from the approved plans or the plans may not adequately address various issues. If this occurs it is the Subdivider's responsibility to notify the City of any discrepancies or omissions in the construction plans. The City will determine if the discrepancy or omission can be resolved in the field or if revised construction plans need to be submitted by the engineer of record. If revisions are determined to be needed, two (2) copies of the revision are to be submitted to the City for review and approval. 5. Inspections and Testing. a. Inspections are to be performed by the City during construction and at varying stages of project completion as they pertain to infrastructure improvements. The Subdivider shall keep the City abreast of the progress made during construction and provide the City with adequate notice for when inspections will be requested. b. See Subdivision Design Standards for additional information and testing requirements. c. The City will make written inspection reports during the period of construction. d. When all of the required improvements have been constructed, the Subdivider shall contact the City for an Initial Acceptance inspection. The City shall inspect the subdivision and make a written report with a punch list. A copy of the written report with a punch list will be provided to the Subdivider. e. Once the Subdivider has completed the items detailed in the written report and punch list in full, the Subdivider shall contact the City to request a reinspection. f. Any items needing completion or correction as detailed in the written report and punch list must be resolved by the Subdivider to the satisfaction of the City. J. AS-BUILT PLANS. 1. As-Built Plans are to be tied to state plane coordinates. The types of as-built plans required are as follows: a. Grading and Drainage Plan. b. Roadway Plan and Profiles. c. Utility Plans. 2. Two (2) paper copies of the As-Built Plans signed and sealed by a licensed engineer in the State of Mississippi shall be provided to the City for review and approval. 3. Three (3) paper copies and one (1) electronic copy of the As-Built Plans signed and sealed by a licensed engineer in the State of Mississippi shall be provided after approval by the City. 4. See Subdivision Design Standards for additional information and requirements. K. PROCEDURE FOR INITIAL ACCEPTANCE. 1. Construction is to be completed and all items on the inspection written report and punch list are to be completed to the satisfaction of the City. 2. As-built plans signed and sealed by a licensed engineer in the State of Mississippi are to be submitted to the City for review and approval. 3. The Performance Bond and Insurance Administrative Requirements are to be updated and resubmitted to the City as necessary to confirm validation for the warranty period. 4. The subdivision name and street names are to be submitted to the City for review and approval. 5. Once these items have been completed to the satisfaction of the City, the City will issue a certificate of Initial Acceptance. The date on the certificate of Initial Acceptance is the start date of the Warranty Period. L. FINAL PLAT APPROVAL PROCEDURE. 1. When the Final Plat conforms to the approved Preliminary Plat, the requirements of the Subdivision Regulations have been accomplished, and Initial Acceptance has been granted, the Final Plat complete with all signatures shall be presented to the MBA for approval. 2. An application form supplied by the City, a filing fee to be fixed by the MBA by separate ordinance, together with copies of any deed restrictions where such restrictions are too lengthy to be shown on the plat, shall be submitted to the City. a. The application must be made no later than two weeks prior to the next regularly scheduled meeting of the MBA to be on the meeting agenda. b. The Subdivider or authorized agent must be present at the meeting scheduled to hear the submitted application. 3. After Final Plat approval is obtained from the MBA and all conditions have been satisfied, two (2) mylar original plats shall be submitted to the City for recording which shall contain the necessary signatures, certificates, and seals as specified in the Subdivision Regulations along with any agreements, bonds, recording fees, and an attorney's certificate of title certifying title to the land subdivided valid as of the hour and day of recording. The City will file the plat for recording with the Office of the Chancery Clerk of Panola County, Mississippi located in Batesville, Mississippi. 4. A reproducible mylar and electronic copy tied to state plane coordinates of the recorded plat shall be provided to the City for its official records. 5. The Final Plat of any subdivision shall not be recorded unless all improvements have been completed, Initial Acceptance granted, and the MBA approves the Final Plat. M. DATA FOR FINAL PLAT. 1. The Final Plat shall be at an appropriate and legible scale from an accurate survey and on one or more sheets whose dimensions shall be 18 inches by 24 inches. If more than two sheets are required, an index sheet of the same dimensions shall be filed showing the entire subdivision on one sheet and the component areas shown on other sheets. The Final Plat and the accompanying documentation shall show the following: a. The boundary lines of the area being subdivided with accurate distances and angles, showing all relationships of the subdivision to section, township, and range. b. All proposed streets and alleys with the widths and the names of all streets. c. The accurate outline of any portions of the property intended to be dedicated or granted for public use with a statement of dedication thereon. d. The line of all adjoining property and the line of adjoining streets or alleys with the widths and the names of all streets within 100 feet of the proposed subdivision. e. All lot lines together with an identification of all lots which shall be numbered consecutively. f. The location of all building setback lines and easements. g. All dimensions, both linear and angular, necessary for locating the boundaries of the subdivision, lots, streets, alleys, easements, and other areas for public or private use. Linear dimensions are to be given to the nearest 1/100 th of a foot. h. The radii, arcs or chords, points of tangency, and central angles for curvilinear streets and radii for rounded corners. i. The location of all survey monuments and their descriptions. j. The name of the subdivision, a graphic scale of the plat, a north arrow oriented toward the top of the page, the date, and the name of the owner or owners or Subdivider. k. Location map showing relationship of subdivision site to area including township, range, section, and parts of sections. l. The seal of the State of Mississippi registered engineer or land surveyor attesting the accuracy of the Final Plat. m. Private restrictions and trusteeships and their periods of existence. Should these restrictions or trusteeships be of undue length as to make their lettering on the plat impractical and thus necessitate the preparation of a separate instrument, reference to such instrument shall be made on the plat. n. Statement to the effect that installing driveway culverts, where needed, is the responsibility of the individual lot owner, not the responsibility of the Subdivider or the City. o. Proper certificates for owner, State of Mississippi notary public, State of Mississippi registered engineer or land surveyor, Planning Commission, MBA, and Office of the Chancery Clerk of Panola County, Mississippi located in Batesville, Mississippi. p. The following certification of the engineer or surveyor of record for the proposed subdivision shall be included on all final plats: "I hereby certify that all dimensions, angles, bearings, and areas shown on the plat are correct, and that the exterior boundaries and interior lot dimensions have an error of closure to no less than 1 in 10,000 feet. N. WARRANTY PERIOD. 1. The Warranty Period begins at the date of Initial Acceptance. 2. The Warranty Period lasts for a period of one (1) year unless otherwise specified by the Engineer. 3. All Administrative Requirements shall remain in effect during the Warranty Period. 4. An inspection will be performed by the City towards the end of the Warranty Period. All items listed in the inspection written report and punch list shall be completed to the satisfaction of the City prior to the issuance of Final Acceptance. 5. The Warranty Period may be extended for a period of one (1) year at the discretion of the Engineer based upon the types of repairs performed as a result of completing the items listed on the inspection written report and punch list. O. PROCEDURE FOR FINAL ACCEPTANCE. Towards the end of the Warranty Period, the Subdivider shall contact the City for a final inspection. Once any items needing completion or correction as detailed in the written report and punch list are resolved to the satisfaction of the City, Final Acceptance may be granted through the issuance of a notice from the City. Once Final Acceptance is granted, the Performance Bond and Insurance Administrative Requirements shall be released and the Development Contract will expire. P. RELATION TO PLANNED UNIT DEVELOPMENT (PUD). Any portion of a tract zoned as a PUD District may be submitted for approval as a Subdivision, provided that the PUD District zoning regulations governing the approval of a PUD are met. In submitting any PUD subdivision for approval, the prior action of the Planning Commission and the appropriate legislative body in granting the zoning application shall be sufficient preliminary plat approval within the meaning of Article IV: PROCEDURE. However, all requirements in Article IV shall be adhered to. The basic purpose of a PUD is to allow flexibility in the development of planned communities. A PUD is intended to facilitate total density control as an alternative to regulation of individual lot size, harmonious development of mixed land uses, creative alternatives to traditional standards for minimum improvements, and development of attractive and functional common areas for recreational and other purposes. Within the general limitations of the Comprehensive Plan, the intent of these regulations and the public interest, convenience, safety and welfare, the Planning Commission may consider this purpose and may waive or modify any requirements of Article V: MINIMUM IMPROVEMENTS AND REQUIREMENTS of these regulations. Q. GRADING PERMITS. A grading permit issued by the City is required for all land disturbing activity on lots, unsubdivided parcels of land, or for Subdivisions in which the total land area is one (1) acre in size or greater, excluding activities explicitly for agricultural purposes. If land disturbing activity is governed by a Subdivision, a separate grading permit is not required unless the Subdivider wishes to begin land disturbing activities prior to a Notice to Proceed being issued. 1. PROCEDURE. a. Two (2) paper copies and one (1) electronic copy of a grading plan submittal conforming to the requirements of Article IV-Q.2 DATA REQUIRED shall be submitted to the City. The copies of the grading plan submittal shall be accompanied by an application form and a filing fee as specified by the MBA. Complete applications for a grading permit must be filed no later than the first day of the month that is not a Saturday, Sunday or City holiday in which City offices are closed in order to be on the agenda of the next regularly scheduled meeting of the Planning Commission. b. It is at the discretion of the City whether an application for a grading permit is to go before the Planning Commission for approval or to be approved administratively by the City. c. The work proposed in the grading plan submittal may warrant the need for providing Administrative Requirements. The City will make this determination at the time the determination is made whether an application for a grading permit is to go before the Planning Commission for approval or to be approved administratively by the City. 2. DATA REQUIRED. a. All applicable local, state, and federal agency permits and approvals are required prior to the City issuing a grading permit (examples of agencies include Mississippi Department of Environmental Quality, United States Army Corp of Engineers, Mississippi Department of Transportation, utility organizations, etc). b. Grading and Drainage Plan, see section E. DATA FOR PRELIMINARY PLAT SUBMITTAL. c. Tree Protection Plan, see section E. DATA FOR PRELIMINARY PLAT SUBMITTAL. d. Erosion Control Plan, see section H. DATA FOR CONSTRUCTION PLAN SUBMITTAL.

Ask a question about Batesville law

Corpus searches the Batesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.