§ 16.5-6 — Construction inspection and enforcement

Code of Ordinances, City of Biloxi, Mississippi (Supp. No. 63, Update 1: codified through Ordinance No. 2607, enacted July 28, 2026) · Biloxi Code of Ordinances § 16.5-6

Corpus is an independent public-information project, not the official City of Biloxi website. Stable reference: corpuslaw.us/code/01344fe2-a193-48db-93a6-bf3346afe6b6

Sec. 16.5-6. - Construction inspection and enforcement.

The owner shall notify the engineering division at least 48 hours before beginning any work in conjunction with stormwater management system construction. (1) Before any land grading activities commence, a pre-construction inspection by the community development department shall verify that all applicable state and federal permits have been secured and are either posted on the project site or are locally available, and shall inspect certificates of compliance and installation of stormwater BMPs. (2) At a minimum, regular monthly inspections by the community development department shall be made throughout the construction period and documented at the specified stages of construction identified in the administrative manual. (3) Implementation of SWPPP requirements and conditions shall be verified and documented through the city's regular monthly inspections. Failure to comply with approved SWPPP requirements or conditions may, for enforcement purposes, be subject to any one or a combination of the following actions: a. A notice of violation shall be issued specifying the need for the violation to be corrected if stormwater management plan noncompliance is identified; b. A stop work order shall be issued for the site if a violation persists; c. Bonds or securities may be withheld or the case may be referred for legal action if reasonable efforts to correct the violation have not been undertaken; or d. In addition to any other sanctions, a civil action or criminal prosecution may be brought against any person in violation of the stormwater management ordinance, as established in section 16.5-19 of this chapter. (4) Any step in the enforcement process may be taken at any time, depending on the severity of the violation, as determined by the director of community development or the city engineer. (5) Once construction is complete, as-built plan certification shall be submitted to the director of community development to ensure that constructed stormwater management practices and conveyance systems comply with the specifications contained in the approved plans. a. At a minimum, as-built certification shall include a set of drawings comparing the approved stormwater management plan with what was constructed. b. Other information shall be submitted as required by the city engineer, the director of public works or the director of community development.

(Ord. No. 2192, Art. 7, 11-29-11; Ord. No. 2229, § 1, 7-9-13; Ord. No. 2570, § 1, 10-22-24)