For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-53 — Electrical provisions

San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio City Code § 10-53

Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/013e0d85-84d8-4c3c-bf88-2711845c2b9d

Sec. 10-53. - Electrical provisions.

(a) General. The provisions of this section shall apply to the design, construction, installation, use and maintenance of electrical systems and equipment. Where differences occur between provisions of this Code and referenced codes or standards, the provisions of this Code shall apply. (b) Equipment and door labeling. The disconnecting means for each service, feeder or branch circuit originating in a switchboard or panelboard shall be legibly and durably marked to indicate its purpose unless such purpose is clearly evident to the code official. Doors into electrical panel rooms shall be marked with a plainly visible and legible sign stating ELECTRICAL ROOM or similar approved wording. (c) TOPS (Temporary on Permanent Set) permit. The section outlines the requirements for obtaining a permit to allow the connection of the new or existing electrical service to CPS Energy prior to having all final inspections completed on a project. The issuance of a TOPS permit and the subsequent connection to the utility company service does not allow an owner or the occupants to occupy the building or structure until a C of O has been issued. The above permit does not waive any of the applicable provisions of articles IV and VIII. (1) Section 10-1302.3.1 Permit Application. A licensed electrical contractor registered with the city must make the application for the TOPS permit. The electrical contractor must also request that the TOPS permit be attached to the main building permit in the city's computer system. The TOPS permit is required in addition to the main electrical permit for the project. (2) The following are the general conditions for obtaining a TOPS permit for new construction and may be modified by the code official to suit project specific conditions: a. The electrical service must be complete along with all grounding requirements, and the electrical conductors originating from the service equipment must be terminated in an approved electrical manner. b. The building permit on residential construction shall have an approved foundation and complete frame inspection. The building permit on commercial construction shall have a complete foundation and at minimum a partial frame inspection. c. On residential construction all trade permits must have approved rough-ins and a complete plumbing top out. On commercial construction all trade permits must have a minimum of a partial rough in including a partial plumbing top out. d. The plumbing sewer permit shall have an approved final inspection on both commercial and residential. (3) Existing construction. The following are the general conditions for obtaining a TOPS permit for existing construction and may be modified by the code official to suit project specific conditions: a. The electrical service must be in good condition and comply with the city electrical code including all grounding requirements. b. The electrical loads originating from the existing service equipment, that will not be utilized for construction power, must be disconnected, and safeguarded from accidental contact with an energized electric bus bar. c. Temporary GFCI protected outlets must be provided at the service equipment location to be used during construction related activities. d. All necessary and or required trade permits must be obtained prior to giving a final approval to CPS to energize the service equipment. (e) Electrical inspections supervisor. The electrical inspections supervisor of the development services department shall also serve as the master of record for electrical work performed by city electricians.

(Ord. No. 2025-01-30-0075, § 1(Att. 1), 1-30-25)

Ask a question about San Antonio law

Corpus searches the San Antonio sections it holds and shows the ones that match, with their citations. Free, no sign-in.