For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 55-562 — Proof of compliance with the minimum design and operation standards

Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 55-562

Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/019ccf09-f2c2-4284-bf3b-76f6a198cca1

Sec. 55-562. - Proof of compliance with the minimum design and operation standards.

(a) A person making an application for recycled water service shall submit the following information to the director for his approval, prior to construction or retrofit of an on-site facility that will use or receive recycled water: (1) Design drawings and specifications which must be in compliance with the UDC, the Plumbing Code, Chapter 210, and other TCEQ regulations and applicable laws; (2) Design drawings and specifications must be in compliance with the city's design standards manual issued by the city engineer; (3) Drawings of the final installed on-site facility and the entire proposed use area; (4) Proof that the user will be compliant with Chapter 210, the UDC, and other city codes, rules and regulations, and that the user has the required backflow prevention assembly on the recycled water service line and sufficient air gap; and (5) Proof, as requested by the director, that the user has sufficient storage facilities for the recycled water and will be in compliance with Chapter 210. (b) The director may issue written notice to the applicant to proceed with construction and/or retrofit upon satisfaction that the applicant meets or shall meet the minimum design and operation standards for recycled water service. (c) After completion of the construction or retrofit of the on-site facilities for recycled water service, the applicant must make a written request for inspection by the city. The inspection shall include the cross connection control and an operational test.

(Ord. No. 029884, § 1, 7-9-2013; Ord. No. 033742, § 1, 9-9-2025)

Ask a question about Corpus Christi law

Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.