§ 8-8-7 — CONSTRUCTION/EXCAVATION ENCROACHMENT REQUIREMENTS AND REGULATIONS
City Code of West Jordan, Utah (2026 S-39: code current through Ord. 26-41, passed 7-28-2026) · West Jordan City Code § 8-8-7
Corpus is an independent public-information project, not the official City of West Jordan website. Stable reference: corpuslaw.us/code/01bb0367-d04d-4d5f-8126-72ab394d57d7
8-8-7: CONSTRUCTION/EXCAVATION ENCROACHMENT REQUIREMENTS AND REGULATIONS:
A. Permit Required: Any person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. desiring to perform any construction or excavation work in the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. shall first apply for and obtain a permit for such work. It is unlawful for any person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. to commence work in the right-of-way until the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. has approved the application and until a permit has been issued for such work, except as specifically provided to the contrary in this chapter. B. Persons Eligible for Permit: No person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. shall be eligible to apply for or receive an encroachment permit ENCROACHMENT PERMIT: A permit issued by the city engineer pursuant to the provisions of this chapter. for construction or excavation, except the following: 1. Contractors licensed by the state The State of Utah. as general contractors; 2. Public utility companies; 3. The city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. ; 4. Local governments, districts, and other political subdivisions of the state The State of Utah. ; 5. Residents installing, replacing, or maintaining less than five hundred (500) square feet or one hundred (100) linear feet of sidewalk, curb and gutter, driveway approach, or other work approved by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. , upon a portion of the public right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. adjacent to their residence. C. Exemptions: 1. It is lawful for a city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. , county COUNTY: The political subdivision of the state of Utah known as Salt Lake County. , or state The State of Utah. employee to perform routine maintenance work, not involving excavations, without first having obtained a permit therefor. 2. A permit is not required for hand digging excavations for installation or repair of sprinkler systems and landscaping within the unpaved areas of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. . However, conformance to all city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. specifications is required. D. Inspections; Charges: If, in the judgment of the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. , it appears desirable to maintain an inspector to determine whether work is being done in compliance with the encroachment permit ENCROACHMENT PERMIT: A permit issued by the city engineer pursuant to the provisions of this chapter. , the city engineer shall assign an inspector, and the permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall pay the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. in accordance with the fees adopted by resolution of the city council CITY COUNCIL CHAIR, COUNCIL CHAIR: This is the council member elected or appointed by a majority of the city council to chair city council meetings (or another council member elected or appointed by a majority of the city council to temporarily act in the council chair’s place). See sections 1-6-9 and 1-6-10. . The provisions of this section shall be applicable to all permittees, including governments, districts and other political subdivisions. E. Project Site Management: 1. The permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall keep the work site and haul routes to and from the work site, clean and free from rubbish, debris and mud at all times. 2. The permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall clean up the work site within twenty four (24) hours after receiving written notice from the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. . Should the permittee not clean up the site as required, the city may perform the cleaning and recover the full cost of cleaning from the permittee. F. Compliance with Specifications, Standards and Traffic Control Regulations: 1. The work performed in the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. shall conform to the requirements of the engineering regulations, design standards, construction specifications and traffic control regulations of the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. . 2. All excavations shall be conducted in a diligent and expeditious manner resulting in a minimum amount of interference or interruption of street STREET: Alleys, roads, lanes, courts, boulevards, public ways, public squares, public places and sidewalks. and pedestrian traffic. All weather pedestrian access to businesses shall be provided. Permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall supply barricades or equivalent structures where necessary to provide safe and efficient traffic flow, and to prevent accidents involving property PROPERTY: Real and personal property. or persons. Barricades must be in place until all of the permittee's equipment is removed from the site and the excavation has been backfilled and the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. restoration has been completed. From sunset to sunrise, all barricades and excavations must be clearly delineated with adequate lighting. The engineering department DEPARTMENT: Community development, fire, police, public works, public utilities, public services, administrative services and legal departments, as well as any special department of the executive branch identified in the organizational chart of the annual budget as amended by ordinance, during the budget year. “Department” does not include the mayor’s office or the justice court department, unless the context clearly indicates otherwise. , the police department and the fire department shall be notified at least forty eight (48) hours in advance of any planned excavation requiring street STREET: Alleys, roads, lanes, courts, boulevards, public ways, public squares, public places and sidewalks. closure or traffic detour. G. Filing of Maps and Drawings: The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may require any person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. owning, using, controlling, or having an interest in any pipe, conduit, duct or tunnel under the surface of any right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. for supplying or conveying gas, electricity, communication facilities, water, steam, ammonia or oil, or for any other purpose, to file in the office of the city engineer, within sixty (60) days after the complete installation, a corrected set of maps or drawings drawn to a scale of not more than fifty feet to one inch (50' = 1") showing the complete installation of all such pipes, conduits, ducts or tunnels. The same may be required showing the location in detail of such pipes, conduits, ducts or tunnels when such are abandoned or altered. Scaled maps and drawings submitted periodically by public utilities shall be deemed in compliance with the intent of this section. If required, all maps and drawings shall be submitted in electronic PDF or CAD format. H. Completion of Work; Restoration of Rights-of-Way: 1. Upon completion of an encroachment, the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. shall be restored by replacing, repairing or rebuilding it to its original condition before the encroachment was commenced, including the completion of any work necessary to restore the right-of-way to a safe and usable condition as directed by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. . All obstructions, materials and debris upon the right-of-way shall be removed. Where excavations occur within areas already paved, the city engineer may require temporary paving and temporary traffic markers to be installed within twenty four (24) hours after the excavated area is backfilled. 2. In the event that the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. is not promptly restored, as provided in this section, or should the nature of any damage to the right-of-way require restoration before the person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. performing the encroachment can be notified or can respond to notification, the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may, at his or her option, make the necessary restoration. The permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall reimburse the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. for the total cost of restoration in accordance with the fees adopted by the city council CITY COUNCIL CHAIR, COUNCIL CHAIR: This is the council member elected or appointed by a majority of the city council to chair city council meetings (or another council member elected or appointed by a majority of the city council to temporarily act in the council chair’s place). See sections 1-6-9 and 1-6-10. . I. Storage of Materials: 1. Storage of excavated soil or other materials shall not be permitted unless included in the encroachment permit ENCROACHMENT PERMIT: A permit issued by the city engineer pursuant to the provisions of this chapter. . Where permitted, materials shall be stored in accordance with the permit, and the permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall be responsible for the safety of the workers and the general public. The permit shall not create any right to use property PROPERTY: Real and personal property. adjacent to the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. , and permittee shall be responsible for coordination with owners of adjacent property PROPERTY: Real and personal property. . 2. In areas too narrow to permit the proper storage of materials, the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may require that the permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. remove the materials from the encroachment site. J. Monuments: A monument set for the purpose of preserving survey points, lines or elevation shall not be removed or disturbed without first obtaining permission from the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. and Salt Lake County COUNTY: The political subdivision of the state of Utah known as Salt Lake County. surveyor. The replacement of a removed or disturbed monument shall be done at the expense of the permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. in accordance with Salt Lake County requirements. K. Open Trenches: In any trenching operation, the open trench shall not be in excess of three hundred feet (300') ahead of the trench work proper, unless specifically authorized by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. . When any excavation is commenced, the work of making and refilling shall be prosecuted diligently until completion. L. Interference with Drainage: If the encroachment interferes with drainage, the permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall provide for proper drainage in a manner approved by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. . M. Small Pipes: Laterals, services, and other small diameter pipes shall be jacked, bored, or driven beneath a paved surface unless other methods are approved by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. . N. Covering Pipes and Conduits: The minimum cover over any pipe or conduit installed under any right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. shall be thirty inches (30") of material measured from the existing or proposed flow line of the nearest gutter to the top of the pipe or conduit. If a gutter flow line is not established, the cover shall be thirty inches (30") of material measured from the surface of the nearest outermost edge of the traveled way to the top of the pipe or conduit. Where there are existing curbs and gutters or where curbs and gutters are under construction, utilities may maintain a minimum thirty inches (30") of cover starting one foot (1') back of the curb line in the parkway or sidewalk area. Maximum cover shall be seventy two inches (72"). The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may permit the installation of pipes or conduits at lesser or greater depths where the required cover cannot be provided. O. Backfilling: The backfilling and compaction of an excavation shall be in accordance with standards established by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. , both as to materials and methods. The backfilling shall commence within forty eight (48) hours after the work in a trench is completed. P. Paving by City CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. : The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. shall have the power to order the paving by city employees of any excavation up to one hundred feet (100') in length. The permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall reimburse the city in accordance with the fees adopted by the city council CITY COUNCIL CHAIR, COUNCIL CHAIR: This is the council member elected or appointed by a majority of the city council to chair city council meetings (or another council member elected or appointed by a majority of the city council to temporarily act in the council chair’s place). See sections 1-6-9 and 1-6-10. . Q. Cleanup: 1. Except for materials properly stored, the permittee PERMITTEE: A person who has been issued an encroachment permit pursuant to the provisions of this chapter. shall at all times keep the public highway PUBLIC HIGHWAY: The part of a right-of-way which is improved for use as a public road, street, way, lane or alley, including shoulders and excluding park strips and sidewalks. clear of all materials, earth and debris. If the permittee fails to do so within twenty four (24) hours after having been notified by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. , the work may be done by the city engineer and the permittee charged in accordance with the fees adopted by the city council CITY COUNCIL CHAIR, COUNCIL CHAIR: This is the council member elected or appointed by a majority of the city council to chair city council meetings (or another council member elected or appointed by a majority of the city council to temporarily act in the council chair’s place). See sections 1-6-9 and 1-6-10. . 2. When a pole, guy stub or similar timber is removed and not replaced, the entire length thereof shall be removed from the ground and the hole backfilled and compacted. R. Coordination of Major Work MAJOR WORK: Any reasonably foreseeable work in the right-of-way that will: a) affect the right-of-way for more than ten (10) calendar days, b) involve a street cut of more than one hundred feet (100') in length, or c) involve a street cut of more than two hundred (200) square feet. Within the Right-of- Way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. : 1. The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may, on or prior to January 1 of each year YEAR: A calendar year commencing January 1 and ending the last day of December apparent from the context of the ordinance language; does not include a city “fiscal year”, as defined in this section. , publish a schedule identifying the location and anticipated start date and completion date of major work MAJOR WORK: Any reasonably foreseeable work in the right-of-way that will: a) affect the right-of-way for more than ten (10) calendar days, b) involve a street cut of more than one hundred feet (100') in length, or c) involve a street cut of more than two hundred (200) square feet. anticipated to be performed within and by the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. during the period beginning on the next succeeding January 1. The schedule may be updated every six (6) months and shall be available for inspection at the office of the city engineer. 2. Applications for encroachments involving major work MAJOR WORK: Any reasonably foreseeable work in the right-of-way that will: a) affect the right-of-way for more than ten (10) calendar days, b) involve a street cut of more than one hundred feet (100') in length, or c) involve a street cut of more than two hundred (200) square feet. shall be accepted by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. on or before November 1 of each calendar year YEAR: A calendar year commencing January 1 and ending the last day of December apparent from the context of the ordinance language; does not include a city “fiscal year”, as defined in this section. for the next year YEAR: A calendar year commencing January 1 and ending the last day of December apparent from the context of the ordinance language; does not include a city “fiscal year”, as defined in this section. period beginning on the next succeeding January 1. The application must be on a form approved by the city engineer and must include a construction schedule which identifies, in reasonable detail, the location and anticipated start date and completion date of all anticipated major work. 3. Permit issuance may be denied or delayed by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. where the person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. requesting a permit fails to timely apply or does not accurately identify the major work MAJOR WORK: Any reasonably foreseeable work in the right-of-way that will: a) affect the right-of-way for more than ten (10) calendar days, b) involve a street cut of more than one hundred feet (100') in length, or c) involve a street cut of more than two hundred (200) square feet. as set forth in this section. Among other things, the city engineer will consider excavation restrictions and other major work when determining the denial or delay. 4. It shall be the general policy of the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. to facilitate coordination of major work MAJOR WORK: Any reasonably foreseeable work in the right-of-way that will: a) affect the right-of-way for more than ten (10) calendar days, b) involve a street cut of more than one hundred feet (100') in length, or c) involve a street cut of more than two hundred (200) square feet. by disclosing application information to other applicants. Any requests to maintain the confidentiality of information submitted pursuant to this section will be considered by the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. in accordance with the provisions of the Utah government records, access and management act. 5. In issuing or conditioning a permit for major work MAJOR WORK: Any reasonably foreseeable work in the right-of-way that will: a) affect the right-of-way for more than ten (10) calendar days, b) involve a street cut of more than one hundred feet (100') in length, or c) involve a street cut of more than two hundred (200) square feet. , the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may do any or all of the following: a) schedule work in the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. in the order in which applications are filed, and without regard to other work in the right-of-way; b) delay or accelerate the commencement date of major work so that such work is performed simultaneously; or c) delay or accelerate the commencement date of major work so that such work is performed in sequence, or is separated by a reasonable period of time TIME; HOW COMPUTED TIME; HOW COMPUTED: The time in which any act provided by this code is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded. : The time in which any act provided by this code is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded. . 6. Each applicant APPLICANT: Any person who proposes to encroach upon a right-of- way and has applied for a permit for the proposed encroachment pursuant to the provisions of this chapter. shall use all available information to coordinate, in good faith, its major work in the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. with work proposed by the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. and other users. S. Excess Capacity: 1. Each competitive utility provider COMPETITIVE UTILITY PROVIDER: Each person who provides public utility services within the city in competition with one or more persons providing the same or similar services. applicant APPLICANT: Any person who proposes to encroach upon a right-of- way and has applied for a permit for the proposed encroachment pursuant to the provisions of this chapter. must determine the size of facilities required to provide the capacity reasonably anticipated to satisfy the needs of such applicant for a minimum of five (5) years following installation and present its determination to the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. . 2. Facilities must be designed and constructed to provide the capacity described above, or such lesser capacity as reasonably approved by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. . T. Excavation Restrictions: 1. The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may, from time to time, impose excavation restrictions on portions of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. . The city engineer will not issue a permit for any portion of the right-of-way subject to an excavation restriction, except as set forth in this section. 2. The duration of the excavation restrictions will be as follows: a. Seven (7) years following the completion of a new street NEW STREET: A street that has received new subbase, the reworking of existing pavement or subbase and the application of new surfacing, or the addition of equal to or greater than two inches (2") of new pavement surfacing overlay. or portion thereof; b. Three (3) years following the resurfacing of a street STREET: Alleys, roads, lanes, courts, boulevards, public ways, public squares, public places and sidewalks. or portion thereof; c. Five (5) years following the completion of any excavation work in the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. . The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may impose the restriction solely on the user USER: A person or entity engaging in any lawful activity within the right-of-way who performed the work, or on such owner OWNER: When applied to a building or land, means and includes any part owner, joint owner, tenant in common, joint tenant or lessee of the whole or of a part of such building or land. and other prospective permittees or class of permittees as the city engineer determines; d. Until excess capacity no longer exists, for any portion of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. where excess capacity exists. 3. The excavation restrictions may include, but are not limited to, one or more, or a combination of the following: a. A limited restriction prohibiting excavation by one user USER: A person or entity engaging in any lawful activity within the right-of-way or type of user that does not preclude excavations by different users or types of users; b. A comprehensive restriction prohibiting all excavation and construction activity in the affected portion of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. ; c. A restriction defining methods and standards of excavation or construction activity within the affected portion of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. . 4. The nature, scope and duration of the restriction will be consistent with the terms described in the notice provided for in this section. The nature, scope and duration of each excavation restriction shall be evidenced in writing WRITING: Communication in printed, handwritten, digital, or other permanent format. , which writing WRITING: Communication in printed, handwritten, digital, or other permanent format. shall be available for inspection during regular business hours at the office of the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. . U. Notice of Excavation Restrictions: 1. The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. shall publish, or cause to be published, annual notice advertising his/her intent to impose excavation restrictions relating to portions of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. which will be under construction during the next succeeding calendar year YEAR: A calendar year commencing January 1 and ending the last day of December apparent from the context of the ordinance language; does not include a city “fiscal year”, as defined in this section. . The notice shall be posted on the state The State of Utah. notice website for three (3) consecutive weeks, starting on or before December 31. In addition, such notice shall be mailed by the city engineer to each person Includes individuals, bodies politic and corporate, companies, partnerships, associations, and other informal entities. who has made written request therefor. The notice shall describe the following: a. The nature of the project giving rise to the restriction; b. The portion of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. affected by the restriction; c. The effective date of the restriction; d. The duration of the restriction; and e. The nature of the restriction. 2. The notice shall invite those to whom the restriction will apply to participate in the project in the manner described by the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. , which may include any or all of the following: a. Locating facilities in the same trench as an applicant APPLICANT: Any person who proposes to encroach upon a right-of- way and has applied for a permit for the proposed encroachment pursuant to the provisions of this chapter. ; b. Sharing the cost of joint facilities with an applicant APPLICANT: Any person who proposes to encroach upon a right-of- way and has applied for a permit for the proposed encroachment pursuant to the provisions of this chapter. ; c. Collocating facilities within a common conduit; d. Entering into lease arrangements with the applicant APPLICANT: Any person who proposes to encroach upon a right-of- way and has applied for a permit for the proposed encroachment pursuant to the provisions of this chapter. ; e. Constructing separate facilities in the project area within the same time frame; f. Otherwise cooperating in a manner mutually agreeable to the users; or g. Participating in the project in such manner as the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. determines to be in the best interests of the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. . h. The notice shall further provide that all interested users must file a permit application with the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. not later than six (6) weeks prior to the estimated date of commencement of construction of the proposed project. Nothing herein shall require the city engineer to publish notice of an excavation restriction which applies to only one user USER: A person or entity engaging in any lawful activity within the right-of-way , provided that written notice of such excavation restriction is mailed or otherwise provided to such user. V. Suspension of Excavation Restrictions: The city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. may temporarily or permanently suspend an excavation restriction for any of the following reasons: 1. To permit work to be performed by the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. ; 2. To permit emergency EMERGENCY: Any unforeseen circumstances or occurrence, the existence of which constitutes a clear and immediate danger to persons or property, or which causes interruption of utility services. repair work, or, in the discretion of the city engineer CITY ENGINEER: The engineer of the city, appointed by the mayor, with the advice and consent of the city council. , work which could not reasonably have been anticipated by the applicant APPLICANT: Any person who proposes to encroach upon a right-of- way and has applied for a permit for the proposed encroachment pursuant to the provisions of this chapter. at the time of publication of the notice of excavation restrictions; 3. Excess capacity no longer exists in the restricted portion of the right- of-way RIGHT-OF-WAY: Any land, or interest therein, which, by deed, conveyance, agreement, dedication, usage, or other process of law, has been reserved for or dedicated to the city for the use of the general public for public purposes. ; 4. To permit the installation of service laterals, the need for which could not have been reasonably anticipated at the time of publication of the notice of excavation restrictions; or 5. Suspension of the restriction is otherwise in the city's best interest. (2001 Code §§ 72-3-601, 72-3-606, 72-3-607, 72-3-611 - 72-3-619; 2009 Code; § 8-8-6; amd. Ord. 16-16, 4-13-2016; Ord. 19-48, 12-11-2019, Effective at 12 noon on January 6, 2020; Ord. 21-17, 5-26-2021)
Ask a question about West Jordan law
Corpus searches the West Jordan sections it holds and shows the ones that match, with their citations. Free, no sign-in.