§ 26-31 — Utility rates, fees and charges
Code of Ordinances, City of Tampa (Supp. No. 148: codified through Ordinance No. 2025-152, enacted December 18, 2025) · Tampa City Code § 26-31
Corpus is an independent public-information project, not the official City of Tampa website. Stable reference: corpuslaw.us/code/03259d9d-fc55-4805-ae7e-c5d710b1a20b
Sec. 26-31. - Utility rates, fees and charges.
(a) Free service. There shall be no free service rendered for any utility service provided by the city. (b) Authority to establish. The city council shall have the authority to set rates, fees and charges by resolution, except for sewer capacity fees as provided in subsection (h) of this section. (c) Types of fees. Fees will be charged for the following services and costs: (1) Day turn-on and account start-up fee; (2) Removal of curb lock; (3) Broken curb lock; (4) Bad check handling charge; (5) Bad check charge if cut off; (6) Delinquent account collection charge; (7) Delinquent account charge if cut off; (8) Emergency turn-on/off at owner's request. (Note: The turn-on fee will be charged for each trip made by a meter service attendant. Service will not be left on when the meter indicates an open valve or faucet); (9) Labor and material costs incurred by the city due to damage to its property. (d) Water rates. (1) The rates for water furnished by the city to the customer shall be based upon the quantity of water, determined by metering, furnished to each premises each billing period or upon the minimum monthly charges, whichever is greater. Different rates are to be charged to premises inside and outside the city limits. (2) Water provided at a bulk watering station is to be charged a rate based on the size of the tank truck. (e) Water rates, fees and charges. (1) All water used, other than for the prevention and extinguishment of fires or for testing of fire hydrants, by the city itself or by any other political subdivision or public agency, except as otherwise provided in any contract between the city and a public agency for supplying water at special rates to any such agency, shall be paid for at meter measurement at the rates hereinafter set forth by the city council and shall not be subject to any meter minimum. (2) The city shall pay an annual fire hydrant charge, per hydrant, as set by city council resolution. (3) Revenues received for water furnished to the city shall be applied and accounted for in the same manner as other revenues derived from the operation of the waterworks system of the city. (f) Water installation charges, connection fees and other fees. The following charges pertain to installation or connection and other fees for services performed by the water department: (1) Installation charges (to be paid prior to the installation). a. Installation charges for five-eighths-inch by three-fourths-inch through two-inch water meters will be established by city council resolution; b. Installation charges for meters larger than two (2) inches shall be computed separately by the water department for each size and location; c. Installation charges for irrigation and credit meters shall be computed separately by the water department; d. If the flow rate requirement in c. (above) is greater than customer's existing service capacity, the customer shall require a new service with adequate capacity and shall pay a new installation charge. e. Installation charges for fire protection system connection assemblies shall be computed separately by the water department for each size and location; f. Additional charges shall be assessed to the customer by the water department for costs incurred due to extraordinary or special conditions which include, but are not limited to, requirements for casing, meter vaults, remote meter reading devices, etc.; g. New water customers who desire to have immediate meter service installations at a time when it is found and determined by the director to be physically impossible to provide such immediate installation may file an application for permission to have a qualified contractor perform the meter service installation. The customer's contractor will furnish and install the complete service with the exception of the meter, which will be installed by the water department and, further, with the exception that only the department, under its permit issued by the state department of transportation, may make those meter service installations when the pipe is located in a state right-of-way. The customer will be responsible for all charges for repair to the meter service installation for a period of one (1) year after the installation is accepted by the city. Upon primary acceptance by the department, all meters, however installed, shall be the sole property of the city and shall constitute part of the water distribution system of the city; contractors performing this work must be certified as to expertise by the water department, use only water department approved materials and install the services in accordance with department standards. Contractors' minimum certification requirements include, but are not limited to, furnishing proof of insurance protecting the city in the amount and coverage set forth in this chapter; providing a bond in the amount of five thousand dollars ($5,000.00) to protect against damage to the city's water system; executing an agreement to hold the city harmless from all claims, suits or actions; and successfully completing examinations administered by the water department to measure expertise in meter service installation; h. The department may reinstall a service of the same size and turn-on at curb stop, if the service meets the water department's standard. If is does not, the customer will be charged all costs necessary to restore the service to the department's acceptable standard up to the new service installation charge. The customer may also be assessed additional charges due to extraordinary or special conditions. (2) Connection fees. a. Applications for water service which are approved by the department are subject to a schedule of connection fees which must be paid by the owner, tenant or occupant of each property to the department before the department shall make the connection. 1. A connection fee shall be charged for properties where no city water service has previously existed. 2. No connection fee shall be charged if city water service has previously existed for that property, provided that the same or lesser flow is required. If a larger meter is required for a property, the customer shall pay a connection fee for the maximum flow rate required, less a credit for the connection fees for the customer's existing domestic service. The credit shall not exceed the new connection fee amount. 3. No connection fee shall be charged when parcels which previously had water service are combined to form a new property, provided the water flow rate requirement for the new property is equal to or less than the sum of the individual water flow rates to the original parcels. If the new water service flow rate required is greater than the sum of the individual flow rates, then connection fess shall be paid solely for that additional flow. 4. If the property is subdivided, each newly created parcel shall pay a connection fee, except for that parcel which retained the prior connection as long as the same or lesser flow is required. 5. No connection fees will be assessed to a consumer requesting a separate meter for lawn irrigation or credit if the consumer has city water service at the time the separate meter is requested and desires the same maximum flow rate (gallons per minute) requirements or less as the existing service. If the irrigation or credit flow requirement is greater than the consumer's existing service, the consumer shall pay a connection fee for the maximum flow rate required, less the connection fee for the consumer's existing service. 6. No connection fee will be assessed solely for lawn irrigation service for irrigation of public rights-of-way or city property. b. Standard and fire protection system connection fees charged shall be in accordance with one (1) of the conditions listed below: 1. Condition 1: i. Connection fees to be paid under this condition are for residential, commercial or industrial premises which existed prior to October 1, 1997, and are located within the corporate limits of the city. These fees may be paid in cash at the time of payment of the meter installation charge. ii. In lieu of paying the lump sum connection fee, the applicant, if an owner of the residential premises, shall have the option of entering into a written agreement with the city to be recorded in the public records of the county to pay the connection fee in twenty-four (24) equal monthly payments plus eight (8) percent interest per annum on the remaining balance due, plus the then current recording fee; provided, monthly payments shall start from the date of payment of the meter installation charge. When the installment agreement has been satisfied in full, the city shall prepare and deliver to the applicant a receipt of full payment of connection fee and satisfaction of terms of agreement; and the applicant shall be responsible for filing same with the clerk of the circuit court for recordation in the public records of the county. iii. Until the installment agreement has been satisfied in full, the unpaid balance (amount) shall be and constitute a lien upon the real property which has been connected to the city's water system; and such lien shall run with the land binding any grantee, assignee, heirs, successors or personal representatives of the owner-occupant. 2. Condition 2: Connection fees to paid under this condition are for water service for all new construction requiring a building permit of the city and located within the corporate limits of the city and for residential, commercial or industrial premises which existed prior to the effective date of the ordinance from which this chapter is derived and are located outside the corporate limits of the city. The applicant who resides in a single-family residence existing prior to October 1, 1997, may finance the connection fee as provided in paragraph 1(ii) above. 3. Condition 3: Connection fees to be paid under this condition are for all new residential, commercial or industrial premises requiring a building permit and located outside the corporate limits of the city. c. Fire protection system connection fees charged shall be established by City Council resolution. (3) Miscellaneous water department fees. a. Application for water service; b. Temporary meter rental; c. Main inspection; d. Fire protection system connection assembly inspection; e. Meter testing. The water department shall have the right to test meters to determine their accuracy. If a customer demands a test when, in the opinion of the water department, the meter is operating correctly, then the customer shall pay for the test, provided the accuracy of the meter dial registration is within one hundred two (102) percent of actual flow through the meter; f. Install or move a temporary two-inch service or a fire hydrant; g. The service charge for readiness to serve private fire protection systems within or outside the city, not metered, is hereby established as a separate fee. Such charges shall be payable annually in advance to the city. No water is to be used from fire protection systems at any point on the line except in case of fire; nor are any fixtures other than those used for fire protection to be connected to such fire line; h. The service charge for fire hydrants in public rights-of-way or easements dedicated to the city is hereby established as a separate fee. Such charges shall be payable annually in advance. No water is to be used from fire hydrants, unless metered, except in case of fire. (g) Wastewater fees and charges. The following are the wastewater department fees and charges: (1) Wastewater disposal charge; For the purposes of determining wastewater disposal charges, an approved meter shall be required for each and every water supply line or water service connection furnished to the premises from all sources, regardless if it be the waterworks of the city, the county, a franchise or any private/public well or other source which provides water for those uses which cause a wastewater stream to be generated, such wastewater stream being allowed to be discharged to the treatment works of the city. The water department shall have the authority for determining and/or approving the appropriate number of meters required to accurately measure the quantity of water to be supplied to the premises. Owners of a single-family residence or a single duplex, however, shall not be required, but may, install a meter on a private water supply source which supplies water to the premises, provided that it is the sole source. (2) Sewer improvement service charge; (3) Disconnect/reconnect charge; (4) Application fees; (5) Commercial plan review and inspection fee; (6) Industrial waste discharge permit application fee; (7) Special user surcharge; (8) Field sampling of wastewater; (9) Laboratory analysis of wastewater; (10) Testing of wastewater; (11) Inspections. (h) Capacity fees. (1) A wastewater capacity fee shall be required for any building, structure or private wastewater disposal system connecting to the treatment works of the city. a. The wastewater capacity fee shall be based on the number of equivalent residential units (ERUs) associated with the existing or proposed development and multiplying the number of ERUs by the wastewater capacity fee for one (1) ERU. The minimum wastewater capacity fee shall be the fee for one (1) ERU. The number of wastewater ERUs shall be the same as the number of water ERUs determined in accordance with section 26-37(a) of city's municipal code. The wastewater capacity fee for one (1) ERU has been calculated to account for the difference between the flow rates associated water demands and the flow rates associated with wastewater demands. b. If the lot or parcel at the time of permit application to the department is connected to the treatment works of the city, credit will be provided for number of ERUs associated with the existing development or the amount of wastewater capacity fee previously paid, whichever is greater. Any unused ERUs associated with the existing development may be used for future developments on the same parcel; however, no refund for unused ERUs will be provided. (2) The cost per wastewater ERU shall be one thousand two hundred thirty-seven dollars ($1,237.00). (3) The wastewater capacity fees shall be reviewed every five (5) years and updated, if determined to be necessary. (4) Affordable housing. a. In accordance with F.S. § 163.31801, the city may provide an exception or waiver for the wastewater capacity fee for the development or construction of housing that is affordable, as defined in F.S. § 420.9071. b. F.S. § 420.9071 definition shall be applied to determine if a development is "affordable" to qualify for $0.00 wastewater capacity fee. It shall be the applicant's responsibility to provide official documents sufficient to demonstrate that a proposed development qualifies under the Florida Statute definition. (5) The capacity fee, once paid for a particular existing or proposed building, structure or service connection which is located on or to be located on a particular lot or parcel of land cannot be transferred or used as a credit or partial payment towards the applicable capacity fee which may be due and payable for an existing or proposed building, structure or service connection which is located on or to be located on a different lot or parcel of land. (6) The wastewater department shall have the authority to withhold approval on the issuance of any site utility, building, building remodeling, foundation or plumbing permit for a building, structure or utility appurtenance which may be connected with or is proposed for connection to the treatment works until such time as the owner, his designee or the applicant for the permit pays the applicable capacity fee. (7) The owner, tenant or occupant of a building used for residential, commercial or industrial purposes which received its initial certificate of occupancy prior to October 1, 1987, for which a sanitary sewer has been constructed, shall pay within ninety (90) days of mailing of the official notification of the completion of the sewer the applicable wastewater capacity fee which is as follows: Water Meter Size in Inches | Wastewater Capacity Fee ⅝ | $ 800.00 1 | 2,000.00 1½ | 4,000.00 2 | 6,400.00 3 | 12,000.00 4 | 20,000.00 6 | 40,000.00 Provided, however, that the tenant or occupant of a building used for residential, commercial or industrial purposes which received its initial certificate of occupancy prior to August 3, 1973, for which a sanitary sewer has been constructed, shall pay no later than ninety (90) days after the official notification of the completion of the sewer a wastewater capacity fee which is twenty-five (25) percent of the fees set out in this paragraph; and, provided further, that if an owner, tenant or occupant of a single-family dwelling shall have paid the single advanced lump sum sewer improvement charge of two hundred ninety-four dollars ($294.00) in full on or before January 8, 1975, no capacity fee shall be payable by or collected from such owner, tenant or occupant. (8) In lieu of paying a lump sum capacity fee, the owner-occupant of a single-family dwelling shall have the option of entering into a written agreement with the city, to be recorded in the public records of the county, to pay the capacity fee in forty (40) equal monthly installments, including interest on the remaining monthly balance due at the annual percentage rate of eight (8) percent, plus the then-current recording fee; however, if the single-family dwelling existed at the time of adoption of Resolution No. 2536-F on June 5, 1973, the payment by the owner of the owner-occupied single-family dwelling shall be twenty dollars and seventy-four cents ($20.74) per month for ten (10) months, plus the then-current recording fee. The owner-occupant who executes the agreement shall make the payments due thereunder on or before the fifteenth of each and every month, beginning the first month after the execution of the agreement, without reminder by the city. When the installment agreement has been satisfied in full, the city shall prepare and deliver to the owner a receipt of full payment of fee for sewer connection and satisfaction of terms of agreement, and the owner shall be responsible for filing same with the clerk of the circuit court for recordation in the public records of the county. Until the installment agreement has been satisfied in full, the unpaid balance (amount) shall be and constitute a lien upon the real property which has been connected to the city's sewer system, and such lien shall run with the land binding any grantee, assignee, heirs, successors or personal representatives of the owner-occupant. (9) The capacity fee, once paid for a particular existing or proposed building, structure or service connection which is located on or to be located on a particular lot or parcel of land cannot be transferred or used as a credit or partial payment towards the applicable capacity fee which may be due and payable for an existing or proposed building, structure or service connection which is located on or to be located on a different lot or parcel of land. (10) The wastewater department shall have the authority to withhold approval on the issuance of any site utility, building, building remodeling, foundation or plumbing permit for a building, structure or utility appurtenance which may be connected with or is proposed for connection to the treatment works until such time as the owner, his designee or the applicant for the permit provides a statement from an official of the water department which specifies the approved number and sizes of the water meters which have been set or are to be installed for the lot or parcel, upon which the permit has been applied for, and pays the applicable capacity fee. a. If the lot or parcel has not been previously connected with the treatment works, the capacity fee shall be that as determined by subsection (h)(3) or (h)(7) of this section. b. If the lot or parcel at the time of permit application to the department is connected with the treatment works and an additional water meter will be required, the capacity fee shall be that as determined by subsection (h)(3) of this section for each additional water meter. c. If the lot or parcel at the time of permit application to the department is connected with the treatment works and a meter, for which capacity fees have previously been paid, is to be removed but replaced with a larger meter, the capacity fee for the larger meter shall be that as determined by subsection (h)(3); however, credit will be given for the amount of capacity fees previously paid for the meter to be removed. If the actual amount cannot be determined, the amount of credit shall be based on the schedule of capacity fees under subsection (h)(7); however, the amount of credit shall be limited to the amount of the capacity fee for the replacement meter. d. If the lot or parcel at the time of permit application to the department is connected with the treatment works and capacity fees have been previously paid and an additional or replacement meter will not be required, there shall be no capacity fee due. e. If the lot or parcel at the time of permit application to the department has had wastewater disposal service discontinued for the previous five (5) (or more) years and/or the owner or previous customer has not paid wastewater disposal charges on the utility account or accounts which may be assigned to a meter or meters within the previous five (5) years (or more), a reactivation charge will be levied based on the following schedule: Minimum Charge The charge will be the product of the number of months the service has been deactivated times the monthly rate below: Meter Size | Inside City | Outside City ¾″ | $1.50 | $1.75 1″ | 4.50 | 5.25 1½″ | 7.50 | 8.75 2″ | 9.00 | 10.50 3″ | 16.50 | 19.25 4″ | 22.50 | 26.25 5″ | 37.50 | 43.75 and shall be due and payable prior to issuance of any permits, or, if no permits are required, prior to reissuance of a certificate of occupancy. (i) Solid waste rates, fees and charges. The following fees are the solid waste department fees and charges: (1) Collection at residential premises; discount rate for elderly. (2) Collection at commercial premises. a. For trailer parks that can be served by curbside collection; b. For commercial premises served by a commercial refuse bin; c. Charges for return trips to refuse bins or for extra lifts due to overspillage; d. For other commercial premises; e. Surcharge for residential units co-located with a commercial premises; f. Delivery and pickup of refuse bins placed for special functions or for retrieval and delivery of refuse bins from delinquent account customers in cases where service has been stopped for nonpayment, occurring within ten (10) working days; g. For specialized services such as rolling out bins prior to dumping or for carrying refuse across private property, except as exempted elsewhere in this chapter; h. Handling charges for unconventional loads that, because of their unusual bulk, mass, volume or weight, require special handling; i. Commercial and construction permit application; j. Commercial and construction permit; k. Rolloff services; l. Replacement fees; m. Recycling fees; n. Compactor services; o. Rental fees; p. Maintenance fees; q. Special services not otherwise specifically provided for. (3) Cleanup of prohibited materials. All costs incurred by the city for the cleanup, removal and/or disposal of prohibited materials in order to protect the health and safety of the citizens of the city shall be charged to the responsible party in addition to a ten-percent administrative fee. (4) Rates for McKay Bay Complex. a. Processible waste to refuse-to-energy facility; b. Processible waste to transfer station; c. Construction, demolition and other debris to transfer station; d. Citizen-resident (brush transfer site use with utility bill); e. Special handled waste; f. Waste direct into furnace; g. Infectious waste; h. Yard and wood waste to transfer station. (5) Credit payments and delinquent accounts at McKay Bay. a. The director of finance or his designee is hereby authorized to implement procedures under which any user of the McKay Bay Complex shall pay on a cash basis, unless credit privileges have been established which provide payment guarantee under one (1) or more of the following: 1. An irrevocable letter of credit with a financial institution having authority to transact business in the state and located within the city limits; 2. A non-interest-bearing escrow deposit made to the city for the account of the solid waste system fund; 3. Other methods of prepayments, approved by the director of finance or his designee, which will not result in the city directly or indirectly giving or lending credit to private firms or individuals. b. The user of the McKay Bay Complex shall be responsible for providing all vehicles and containers using a credit method of payment with an eight-digit customer/vehicle number assigned by the manager of the complex and displayed in two (2) locations on the container and vehicle. c. The director of finance or his designee is hereby authorized to establish the amounts of payment guarantee so as to ensure that the total payment guarantee is equal to the amount established to cover an average month's period charge plus thirty (30) additional billing days. The amount estimated shall be subject to change or adjustment made at the discretion of the director of finance or his designee and shall be based on such factors as changes in use of services, adjustments in fee schedules, payment history or other such variables as deemed appropriate. d. The director of finance or his designee is authorized to charge interest on any delinquent account at a rate not to exceed the maximum allowed by law beginning the twentieth calendar day following the initial billing date. e. The director of finance or his designee is authorized to declare all fees due and payable and revoke the credit privileges for use of the complex at any time upon finding that the user's current billing for usage of the facilities is delinquent or exceeds the user's payment guarantee as defined in this chapter. A billing will be declared delinquent when it has not been received by the city within twenty (20) calendar days after the initial billing date. f. The director of finance or his designee is authorized to collect the amount of the delinquent billing and any additional charges for use of the complex from the user's payment guarantee as defined in this chapter. g. The director of finance or his designee is authorized to set minimum and maximum amounts of funds which must be set aside as cash substitutes in compliance with the provisions of this chapter. (6) Special collection services at customer's request or by direction of solid waste code inspection. (j) Reclaimed water rates, fees and charges. (1) The rates for reclaimed water furnished by the city to the customer shall be based upon the quantity of reclaimed water, determined by metering, furnished to each premises each billing period. All reclaimed water used, except as otherwise provided in any contract between the city and a public agency for supplying reclaimed water at special rates to any such agency, shall be paid for through meter measurement at the rates hereinafter set forth by city council resolution. (2) Reclaimed water provided in bulk will be charged a rate based on volume. (3) The following rates, fees or charges may apply when set by city council resolution: a. Application for reclaimed water service; b. Reclaimed water meter installation; c. Backflow prevention device installation and maintenance; d. Relocation of reclaimed water meters; e. Reinstallation of reclaimed water meter; f. Quantity of reclaimed water used, based on reclaimed water meter readings; g. Emergency turn on/turn off of reclaimed water service; h. Meter testing of reclaimed water meter; i. Readiness to serve charge; j. Billing charge; k. Base charge; l. Permit fees as applicable. (k) Grease management program rates, fees, and charges. The following are the wastewater department's fees for administration of the grease management program. (1) Inspection and reinspection fees; (2) Sampling fees; (3) Pump out fees; (4) Special services not otherwise provided for.
(Ord. No. 89-253, § 2(58-36), 9-28-89; Ord. No. 90-148, §§ 3—7, 5-24-90; Ord. No. 90-240, § 1, 9-20-90; Ord. No. 90-257, § 1, 10-18-90; Ord. No. 91-185, § 1, 9-26-91; Ord. No. 91-12, § 1, 1-23-92; Ord. No. 92-170, § 1, 10-15-92; Ord. No. 97-155, § 3, 7-24-97; Ord. No. 98-120, § 1, 5-28-98; Ord. No. 98-183, § 1, 8-20-98; Ord. No. 2004-119, § 3, 5-6-04; Ord. No. 2005-243, § 1, 9-8-05; Ord. No. 2006-258, §§ 2, 3, 10-19-06; Ord. No. 2006-289, § 1, 11-16-06; Ord. No. 2020-104, § 2, 10-15-2020)
Ask a question about Tampa law
Corpus searches the Tampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
